background image

 

 

 

Summary of Contents for SINAMICS S120

Page 1: ......

Page 2: ......

Page 3: ...put side ___________________ ___________________ ___________________ SINAMICS S120 Cabinet Modules Option L34 parameterizing the circuit breaker on the output side Operating Instructions 04 2014 A5E02914106A Safety notes 1 Description 2 Operation software 3 ...

Page 4: ...by personnel qualified for the specific task in accordance with the relevant documentation in particular its warning notices and safety instructions Qualified personnel are those who based on their training and experience are capable of identifying risks and avoiding potential hazards when working with these products systems Proper use of Siemens products Note the following WARNING Siemens product...

Page 5: ...t breaker on the output side Operating Instructions 04 2014 A5E02914106A 5 Table of contents 1 Safety notes 7 1 1 General safety instructions 7 2 Description 11 3 Operation software 13 3 1 Handling instruction for execution of scripts 13 ...

Page 6: ...Table of contents Option L34 parameterizing the circuit breaker on the output side 6 Operating Instructions 04 2014 A5E02914106A ...

Page 7: ...d phase conductor to protective conductor Check that every auxiliary circuit is de energized Ensure that the motors cannot move 3 Identify all other dangerous energy sources e g compressed air hydraulic systems or water 4 Isolate or neutralize all hazardous energy sources by closing switches grounding or short circuiting or closing valves for example 5 Take measures to prevent reconnection of the ...

Page 8: ...g or incorrectly implemented protective conductor connection for devices with protection class I high voltages can be present at open exposed parts which when touched can result in death or severe injury Ground the device in compliance with the applicable regulations WARNING Danger to life due to electric shock when opening plug connections in operation When opening plug connections in operation a...

Page 9: ...l as a result of fire and smoke Use a monitoring device that signals an insulation fault Correct the fault as quickly as possible so the motor insulation is not stressed WARNING Danger to life due to fire if overheating occurs because of insufficient ventilation clearances Inadequate ventilation clearances can cause overheating with a risk for personnel as a result of fire and smoke This can also ...

Page 10: ...nctions that are inactive or that have not been adjusted accordingly can cause operational faults on machines that could lead to serious injury or death Observe the information in the appropriate product documentation before commissioning Carry out a safety inspection for functions relevant to safety on the entire system including all safety related components Ensure that the safety functions used...

Page 11: ...nual A script can be used for the automatic parameterization which automatically makes the parameter settings in STARTER For the automatic parameter setting of option L34 output side circuit breaker you will find the script output_side_circuit_breaker xml on the customer DVD supplied with the device To run the script the following steps must be completely carried out in the completed project Free ...

Page 12: ...Description Option L34 parameterizing the circuit breaker on the output side 12 Operating Instructions 04 2014 A5E02914106A ...

Page 13: ... software 3 3 1 Handling instruction for execution of scripts Inserting a script folder into the project 1 Right click the project in offline mode in the project navigator to open the project s context menu 2 Select Expert in the context menu 3 Left click Insert script folder to insert a new script folder into the project ...

Page 14: ...tput side 14 Operating Instructions 04 2014 A5E02914106A Your inserted script folder should look like this Importing the script 1 Right click the SCRIPTS folder in the project navigator to open the context menu of the script folder 2 Left click Import object in the context menu of the script folder to open the Import window ...

Page 15: ...window The Explorer window for the script import will open 4 Now select the path to the XML script from the customer DVD e g D 99 SOFTWARE SCRIPT_OptionL34 or to any memory location on your hard disk Left click the XML script output_side_circuit_breaker xml 5 Left click the Open button in the Explorer window to accept the path to the script 6 Left click the OK button in the Import window to import...

Page 16: ...ted script should look like this Accepting and executing the script For the following steps you must have the project in online mode 1 Left click Connect to target system in the toolbar 2 Right click the script output_side_circuit_breaker in the project navigator to open the context menu of the script 3 Then left click Accept and execute in the context menu The script is saved and executed ...

Page 17: ...e script is executing The user interface of the application is blocked while the script is executing Selecting the drive objects DO If several drive objects DO and or several input output components are available in the project e g Terminal Module TM31 you will be requested to select the desired object and or component 1 Select the desired drive object DO by entering the corresponding number 2 Con...

Page 18: ...nt TM31 by entering the corresponding number 4 Confirm your selection with OK 5 Confirm your selection with OK when you have selected the correct drive object DO and or input output component TM31 6 If the report window appears showing Programming successful parameter assignment has been completed successfully Confirm with OK Note If the script has not been executed after approx 3 min cancel and r...

Page 19: ......

Page 20: ......

Reviews: