Page 20
Version 1.0 March 1, 2000
Connect External Wiring as connection diagram.
Step 1: Dry set of contacts between terminals X101, pin#1 and pin#5 for
Local/Remote Mode Selection. Jumper if not required.
Step 2: Dry set of contacts between terminals X101, pin#1 and pin#8 for
Coast to Stop Selection. Jumper if not required.
Step 3: Dry set of contacts between terminals X101, pin#1 and pin#9 for
Source of Main Start/Stop Selection.
Step 4: Dry set of contacts between terminals X101, pin#1 and pin#7 for
Source of Fault Reset. Leave open if not required. “P” button on PMU
will be fault reset location if pin#7 is not used.
Step 5: Dry set of contacts between terminals X101, pin#1 and pin#6 for
Fixed Speed or Preset Speed Selection. Leave open if not required.
Internal Connections
Customer
Connection Points
Summary of Contents for SIMOVERT MASTERDRIVES 6SE70 VC
Page 4: ...Page 4 Version 1 0 March 1 2000 ...
Page 6: ...Page 6 Version 1 0 March 1 2000 ...
Page 16: ...Page 16 Version 1 0 March 1 2000 ...
Page 28: ...Page 28 Version 1 0 March 1 2000 ...
Page 30: ...Page 30 Version 1 0 March 1 2000 ...
Page 32: ...Page 32 Version 1 0 March 1 2000 ...
Page 34: ...Page 34 Version 1 0 March 1 2000 ...
Page 40: ...Page 40 Version 1 0 March 1 2000 ...
Page 44: ...Page 44 Version 1 0 March 1 2000 ...
Page 48: ...Page 48 Version 1 0 March 1 2000 ...