Mounting
4.2 Checklist before installation
Planetary gearboxes for servomotors
Operating Instructions, 09/2020, A5E50494253B AA
37
4.2
Checklist before installation
Note
Required checks
The checklists below do not purport to be complete. It may be necessary to perform
additional checks and tests in accordance with the situation specific to the particular
installation site.
Install the geared motor as described in the following chapters of the Operating Instructions.
Thoroughly familiarize yourself with the safety instructions and observe the checklists below
before starting any work.
Checklist (1) - general checks
Check
OK
Are all of the necessary components of the configured drive line-up available, correctly
dimensioned, installed and connected?
Are the environmental conditions in the permissible range?
Checklist (2) - checks regarding the mechanical system
Check
OK
Is the geared motor free of any visible damage?
Have the mounting surfaces (e.g. flange, shaft) on the customer's machine and on the
geared motor been cleaned?
Are the mounting surfaces free of corrosion?
Do the mounting dimensions (e.g. shaft diameter, shaft length, true run) on the cus-
tomer machine meet the specification?
Motor-specific information
Motor-specific information about installation is provided in the Operating Instructions of the
connected motors.