![Siemens Simotics HV C 1NA14544WA600AG0-Z Operating Instructions And Installation Instructions Download Page 78](http://html.mh-extra.com/html/siemens/simotics-hv-c-1na14544wa600ag0-z/simotics-hv-c-1na14544wa600ag0-z_operating-instructions-and-installation-instructions_379029078.webp)
9.2.4
General inspection
● Check that the installation conditions are observed. Perform the following checks after
approx. 16 000 operating hours or at the latest after two years:
Checking
When the
motor is
running
At stand‐
still
The electrical parameters are maintained
X
The permissible bearing temperatures are not exceeded
X
The smooth running characteristics and machine running noise have not
deteriorated
X
The foundation has no cracks or indentations. (*)
X
X
The machine is aligned within the permissible tolerance ranges.
X
All the fixing bolts/screws for the mechanical and electrical connections
have been securely tightened
X
All the potential connections, grounding connections and shield supports
are correctly seated and properly bonded
X
The winding insulation resistances are sufficiently high (Page 34)
X
Any bearing insulation is fitted as shown on the plates and labels
X
The CABLES and insulating parts and components are in good condition
and there is no evidence of discoloring
X
Condensation can freely flow away.
X
(*) This check can be made at standstill or when running.
● If you detect any deviations during the inspection, you must rectify them immediately. They
may otherwise cause damage to the machine.
Checking the cooling system
● With the machine stopped, check the condition of the cooling system:
– The cooling system is in good condition.
– The pressure drop between entry and exit has not increased appreciably.
9.2.5
Servicing the water-jacket cooling
● During each inspection, check whether a pool of water has collected under the machine.
Identify the cause: This can be condensation or a leak in the cooling system.
● Check any leakage water electrodes. If necessary, contact your Service Center
9.2.6
Assessing the rolling bearings
To assess the rolling bearings, it is generally not necessary to dismantle the machines. The
motor only has to be dismantled if the bearings are to be replaced.
Maintenance
9.2 Inspection and maintenance
SIMOTICS HV C 1NA14544WA600AG0-Z
78
Operating Instructions 06/2018
Summary of Contents for Simotics HV C 1NA14544WA600AG0-Z
Page 2: ...14 06 2018 09 34 V3 00 ...
Page 10: ...Table of contents SIMOTICS HV C 1NA14544WA600AG0 Z 10 Operating Instructions 06 2018 ...
Page 74: ...Operation 8 9 Faults SIMOTICS HV C 1NA14544WA600AG0 Z 74 Operating Instructions 06 2018 ...
Page 100: ...Service and Support SIMOTICS HV C 1NA14544WA600AG0 Z 100 Operating Instructions 06 2018 ...
Page 104: ...Quality documents SIMOTICS HV C 1NA14544WA600AG0 Z 104 Operating Instructions 06 2018 ...
Page 106: ...Additional documents SIMOTICS HV C 1NA14544WA600AG0 Z 106 Operating Instructions 06 2018 ...
Page 110: ...Index SIMOTICS HV C 1NA14544WA600AG0 Z 110 Operating Instructions 06 2018 ...
Page 111: ......