Plant installation
4.10 Loops
Power Line Booster
56
Operating Instructions, 11/2019, A5E36203125A-AG
section Master position (Page 42) regarding vehicles between master and the most remote
slave must be observed. From this value, you must then still subtract the number for the
additional segment (see "Interruptions of the communication rail (Page 40)"). For the
connection between master and rail, we recommend using the 8 meter PLB connection
Figure 4-6
Loop with interrupt section
See also
PLB connection cable (Page 32)
Summary of Contents for SIMATIC Power Line Booster
Page 34: ......