![Siemens SIMATIC PN/M-Bus LINK Operating Instructions Manual Download Page 44](http://html.mh-extra.com/html/siemens/simatic-pn-m-bus-link/simatic-pn-m-bus-link_operating-instructions-manual_379399044.webp)
Diagnostics
10.1 Status LEDs
PN/M-Bus LINK
42
Operating Instructions, 03/2018, A5E44260928-AA
RUN
LED
ERROR
LED
MAINT
LED
1)
Operating
state
Description
On
On
On
Power-up test /
Serious error
•
For approximately 1 second: LED test
during startup
•
Longer than 1 second: HW error detected
during power-up test or other serious error
Off
Off
Off
System run-up
•
System not completely booted yet but
power-up test is complete.
Flashes
Off
Off
Not connected to
S7 controller
•
No "IO controller" connection established
or
•
configuration not yet completed.
On
x
Off
Connected to S7
controller
•
"IO controller" connection established and
configuration completed.
x
Flashes
Off
Error state
•
"IO controller" connection established and
configuration completed, but an error oc-
curred:
–
Diagnostic message to the S7 control-
ler is pending or
–
Incorrect configuration by the S7 con-
troller
Flashes for at least 3 seconds.
Flashes
Off
Off
Firmware update
•
While the firmware is written to the flash
memory.
Flashes
Flashes
Off
LEDs are flash-
ing (triggered by
TIA Portal)
•
3-second intervals
•
For identification of the device
1) The MAINT LED currently has no meaning.
x: LED state is irrelevant
When PN/M-Bus LINK starts up after the power supply is switched on, the process continues
as follows:
1.
The three LEDs light up briefly for about 1 second and then go dark again.
2.
None of the LEDs light up for about 4 seconds.
3.
The RUN LED starts flashing.
4.
Once the startup of PN/M-Bus link has been successfully completed and the connection
with the S7 controller has been established, the RUN LED lights up.