6 Startup of the Application
6.1
Preparing measures
Evaluating An Access Point Clients List
V1.0, Entry ID: 48946495
55
C
opyr
ight
Si
em
ens
AG
20
1
1
A
ll rig
h
ts
re
se
rve
d
6
Startup of the Application
6.1 Preparing
measures
Table 6-1
No.
Action
1.
Linking all nodes:
Link all nodes through the Ethernet and make sure that there is a connection to all nodes.
access points
Controller
PC / Laptop
2.
Configuring the access point:
Make sure all access points have been configured.
3.
Transferring S7 configuration:
Transfer the STEP 7 configuration to the controller.
Make sure that the PLC controller is subsequently in the “RUN” mode.
4.
Transferring WinCC flexible configuration:
Transfer the WinCC flexible configuration.
Once you have transferred the configuration, the panel establishes a secure connection to the
controller.