3. Install and secure the cables entering the enclosure and make sure they have adequate
strain relief. The cable entry may only be used for strain relief if suitable cable glands are
used.
4. Route the cables from below through the associated glands and tighten the clamping screw
of the gland at the torque specified in the manufacturer's instructions.
5. Make a short connection between the cable screen and the equipotential bonding rail.
6. Route and connect in accordance with EN 60079-11:
– The power supply cable
– The bus cable
– The signal cables
In hazardous areas, the installation regulations according to EN 60079-14 and the national
regulations must also be observed.
7. If you replace installed components, follow the instructions in the manufacturer's description
of the device.
See also
Mounting
5.2 Mounting the enclosure
Distributed I/O device 6DL2804-1xxxx & 6DL2804-2xxxx
Hardware Installation Manual, 07/2017, A5E42025214-AA
21