18
SICAM T 7KG966, Product Information
E50417-B1050-C493-A4, Edition 12.2012
exceeded (e.g. during a ground fault of one phase).
You must use voltage transformers in IT networks.
8.4
Commissioning
Before you switch on the supply voltage, verify that the
operational data match the rated data on the name
plate and the technical data according to Chapter 17.
This applies in particular to the supply voltage V
H
and
to the maximum current and voltage values of the
device. After an operating time of approximately
15 minutes, the device will stay within the tolerances
specified in the technical data.
The delivery includes a lithium battery that powers the
battery-buffered memory and the real-time clock. Upon
delivery the battery is insulated in the battery
compartment of the device.
1. Lever the cover of the battery compartment out of
the socket with a suitable tool (e.g. precision
engineer screwdriver 2.0 mm).
Figure 8-2 Device Top Side
Cover of
the battery
Type plate
Polarity of
compartment
battery