Installation
36
SICAM RTUs, SICAM AK 3 User Manual
Edition 07.2016, DC2-028-2.03
1.3
Installation and Removal of Modules
Warning
The activities described in this section presume that the grounding connection between SICAM AK 3 and
cabinet or rack has been properly carried out and that these are earthed.
1.3.1 Preparations
1.3.1.1 Connect and put on Grounding Strap
The grounding strap can be connected directly to the board rack. The connection point is lo-
cated on the left side panel of the board rack
•
.
Designation
Item-Number/MLFB
Grounding Strap
TF3-133
6MF13140DB330AA0
ACHTUNG
HANDHABUNGS-
VORSCHRIFTEN
BEACHTEN
ELEKTROSTATISCH
GEFÄHRDETE
BAUELEMENTE
SICAM AK
PS -263x
SICAM AK
P S-263x
DI-2110
CP-2016
CP-2019
A I-2301
AI-2300
DO-2210
DI-2110
DI- 2110
DI-2110
A I-2300
DI-2110
DI-2110
DI-2110
CP-2019
A I-2301
DO- 2210
SICAM AK
PS -263x
SICAM AK
P S-263x
DI-2110
CP -2016
CP-2019
A I-2301
A I-2300
DO- 2210
DI-2110
CM-2844
CM-2846
1
1
Summary of Contents for SICAM AK 3
Page 8: ...Open Source Software 8 SICAM RTUs SICAM AK 3 User Manual Edition 07 2016 DC2 028 2 03 ...
Page 84: ...Installation 84 SICAM RTUs SICAM AK 3 User Manual Edition 07 2016 DC2 028 2 03 ...
Page 166: ...System Components 166 SICAM RTUs SICAM AK 3 User Manual Edition 07 2016 DC2 028 2 03 ...
Page 180: ...Prepare Engineering 180 SICAM RTUs SICAM AK 3 User Manual Edition 07 2016 DC2 028 2 03 ...