background image

Introduction 

 

1.3 Unpacking and checking 

 

SCALANCE X005 / X005TS 

8

 

Operating Instructions, 07/2014, C79000-G8976-C344-01 

Accessories 

 

Component 

Packaging unit 

Order number 

IE FC Stripping Tool 

6GK1901-1GA00 

IE FC blade cassettes 

6GK1901-1GB00 

IE FC TP standard cable GP 

6XV1840 2AH10 

IE FC TP trailing cable 

6XV1840-3AH10 

IE FC TP marine cable 

6XV1840-4AH10 

IE FC TP trailing cable GP 

6XV1870-2D 

IE FC TP flexible cable GP 

6XV1870-2B 

IE FC RJ-45 Plug 180 

6GK1 901-1BB10-2AA0 

IE FC RJ-45 Plug 180 

10 

6GK1 901-1BB10-2AB0 

IE FC RJ-45 Plug 180 

50 

6GK1 901-1BB10-2AE0 

1.3

 

Unpacking and checking 

Unpacking and checking 

 

 

WARNING 

Do not use any parts that show evidence of damage 
If you use damaged parts, there is no guarantee that the device will function according to 

the specification. 
If you use damaged parts, this can lead to the following problems: 

 

Injury to persons 

 

Loss of the approvals 

 

Violation of the EMC regulations 

 

Damage to the device and other components 

Use only undamaged parts. 

 

1.

 

Make sure that the package is complete. 

2.

 

Check all the parts for transport damage. 

 

 

WARNING 

If the SCALANCE X005TS device is operated in an ambient temperature of between 60 

 

and 65 °C, the temperature of the device housing may be higher than 65 

. The device 

must therefore be installed so that it is only accessible to service personnel or users that 

are aware of the reason for restricted access and the required safety measures at an 

ambient temperature of 60 

 to 65 °C. 

Summary of Contents for SCALANCE X005

Page 1: ...___________ ___________________ ___________________ SIMATIC NET Industrial Ethernet switches SCALANCE X005 X005TS Operating Instructions 07 2014 C79000 G8976 C344 01 Introduction 1 Network topologies 2 Description of the device 3 Mounting 4 Connecting up 5 Maintenance and troubleshooting 6 Technical specifications 7 Approvals 8 Dimension drawings 9 ...

Page 2: ...nly by personnel qualified for the specific task in accordance with the relevant documentation in particular its warning notices and safety instructions Qualified personnel are those who based on their training and experience are capable of identifying risks and avoiding potential hazards when working with these products systems Proper use of Siemens products Note the following WARNING Siemens pro...

Page 3: ...stallation 17 4 2 Installation on a DIN rail 18 4 3 Installation on a standard rail 20 4 4 Wall mounting 21 5 Connecting up 23 5 1 Power supply 23 5 2 Grounding 24 5 3 IE FC RJ 45 Plug 180 24 6 Maintenance and troubleshooting 27 7 Technical specifications 29 8 Approvals 31 8 1 Approvals_intro_X 000 31 8 2 Note for Australia 32 8 3 Notes on the cULus approval 32 8 4 Notes on the e1 E1 approval of t...

Page 4: ...Table of contents SCALANCE X005 X005TS 4 Operating Instructions 07 2014 C79000 G8976 C344 01 ...

Page 5: ...t you can operate along with the SCALANCE X005 and SCALANCE X005TS IE switches in an Industrial Ethernet network You can order the manual SIMATIC NET Industrial Twisted Pair and Fiber Optic Networks release 05 2001 using the following order numbers 6GK1970 1BA10 0AA0 German 6GK1970 1BA10 0AA1 English 6GK1970 1BA10 0AA2 French 6GK1970 1BA10 0AA4 Italian You will also find this network manual on the...

Page 6: ...tion of plants solutions machines equipment and or networks They are important components in a holistic industrial security concept With this in mind Siemens products and solutions undergo continuous development Siemens recommends strongly that you regularly check for product updates For the secure operation of Siemens products and solutions it is necessary to take suitable preventive action e g c...

Page 7: ...sary to prevent interference by strong electromagnetic pulses on the supply lines These can result for example due to lightning or switching of large inductive loads One of the tests used to attest the immunity of these devices to electromagnetic interference is the surge immunity test according to EN 61000 4 5 This test requires overvoltage protection for the power supply lines A suitable device ...

Page 8: ...G Do not use any parts that show evidence of damage If you use damaged parts there is no guarantee that the device will function according to the specification If you use damaged parts this can lead to the following problems Injury to persons Loss of the approvals Violation of the EMC regulations Damage to the device and other components Use only undamaged parts 1 Make sure that the package is com...

Page 9: ...fies network expansion Which topologies can be implemented Using the SCALANCE X005 and SCALANCE X005TS IE switches you can implement star topologies Note Keep to the maximum permitted cable lengths of the devices you are using You will find the permitted cable lengths in the section Technical specifications Page 29 Star topology Figure 2 1 Example of a star topology with SCALANCE X005 ...

Page 10: ...Network topologies SCALANCE X005 X005TS 10 Operating Instructions 07 2014 C79000 G8976 C344 01 ...

Page 11: ...C environment Diagnostics LED 24 VDC 2 x 24 VDC Compact housing securing collar etc Signaling contact on site operation Diagnostics Web SNMP PROFINET C PLUG Ring redundancy with RM Passive ring redundancy Standby redundancy IRT capability Fast learning Passive listening Log table SNTP SICLOCK Cut Through Table 3 2 Overview of the connection options X005 X005TS TP RJ 45 Fast Ethernet 10 100 Mbps 5 ...

Page 12: ...07 2014 C79000 G8976 C344 01 3 2 Product characteristics Possible attachments The SCALANCE X005 and SCALANCE X005TS have five RJ 45 jacks for connection of end devices or other network segments Figure 3 1 SCALANCE X005 Note The SCALANCE X005 shown above has the same construction as the SCALANCE X005TS ...

Page 13: ...n be connected to the TP port with RJ 45 jacks With the IE FC cables and IE FC RJ 45 plugs 180 an overall cable length of a maximum of 100 m is permitted between two devices depending on the cable type Autonegotiation With the autonegotiation mechanism repeaters and end devices can automatically determine the transmission speed and the transmission mode of the partner port This makes it possible t...

Page 14: ...crossover cable This prevents malfunctions resulting from mismatching send and receive lines This makes installation much easier for the user The SCALANCE X005 and SCALANCE X005TS devices support the MDI MDI X autocrossover function Insulation between the TP ports There are two TP port groups Group 1 P1 Group2 P2 to P5 Between ports of different port groups an insulation voltage of 1 5 kV is adher...

Page 15: ...of the power supply LED color LED status Meaning Green Lit Power supply is connected Off Power supply is not connected or 14 V Port LEDs P green yellow LEDs The port LEDs indicate the status of the ports LED color LED status Meaning Green Lit TP link exists no data reception at port Yellow Lit TP link exists data reception at port Yellow Flashing Test phase during power on ...

Page 16: ...Description of the device 3 4 LEDs SCALANCE X005 X005TS 16 Operating Instructions 07 2014 C79000 G8976 C344 01 ...

Page 17: ...C or the branching point of conductors exceeds 80 C special precautions must be taken If the equipment is operated in an air ambient in excess of 50 C to 60 C only use cables with admitted maximum operating temperature of at least 80 WARNING Protective measures need to be taken to ensure that the rated voltage of the equipment cannot be exceeded by more than 40 by transient surges This is achieved...

Page 18: ...l complying with DIN EN 50022 follow the steps below 1 Place the second housing guide of the device on the top edge of the DIN rail 2 Press the device down against the DIN rail until the spring catch locks in place 3 Fit the connectors for the power supply See also section Power supply Page 23 4 Insert the terminal block into the sockets on the device Figure 4 1 Installation on a 35 mm DIN rail ...

Page 19: ... To remove the device from the DIN rail follow the steps below 1 Disconnect all connected cables 2 Pull out the terminal block for the power supply 3 Release the DIN rail catch on the bottom of the device using a screwdriver 4 Pull the lower part of the device away from the DIN rail Figure 4 2 Removal from a 35 mm DIN rail ...

Page 20: ... of the S7 300 standard rail 2 Screw the device to the underside of the standard rail tightening torque 2 Nm 3 Fit the connectors for the power supply See also section Power supply Page 23 4 Insert the terminal block for the power supply into the socket on the device Figure 4 3 Installation on a SIMATIC S7 300 standard rail Removal To remove the device from the S7 300 standard rail follow the step...

Page 21: ...nd 40 mm long To mount the device on a wall follow the steps below 1 Prepare the drill holes for wall mounting For the precise dimensions refer to the section Dimension drawings Page 35 2 Fit the connectors for the power supply See also section Power supply Page 23 3 Insert the terminal block into the sockets on the device 4 Screw the device to the wall Note The wall mounting must be capable of su...

Page 22: ...Mounting 4 4 Wall mounting SCALANCE X005 X005TS 22 Operating Instructions 07 2014 C79000 G8976 C344 01 ...

Page 23: ...upply The power supply unit to supply the device must comply with NEC Class 2 voltage range 18 32 V current requirement 350 mA Do not operate the device with an AC voltage Never operate the device with DC voltages higher than 32 VDC WARNING The equipment is designed for operation with Safety Extra Low Voltage SELV by a Limited Power Source LPS This means that only SELV LPS complying with IEC 60950...

Page 24: ...ce as possible If the device is mounted on a non conductive base a grounding cable must be fitted The grounding cable is not supplied with the device Connect the paint free surface of the device to the nearest grounding point using the grounding cable 5 3 IE FC RJ 45 Plug 180 The rugged node connectors are designed for industry with PROFINET compliant connectors and provide additional strain and b...

Page 25: ... fit and locking mechanism with the PROFINET compliant male connector IE FC RJ45 Plug 180 the securing collar on the TP port of the device ensures a rugged node attachment that provides strain and bending relief for the RJ 45 jack Pulling the IE FC RJ45 Plug 180 Press on the locking lever of the IE FC RJ45 Plug 180 gently to remove the plug If there is not enough space to release the lock with you...

Page 26: ...Connecting up 5 3 IE FC RJ 45 Plug 180 SCALANCE X005 X005TS 26 Operating Instructions 07 2014 C79000 G8976 C344 01 ...

Page 27: ...switches have a resettable fuse PTC If the fuse triggers all LEDs are off despite correctly applied power supply the device should be disconnected from the power supply for approximately 30 minutes before turning it on again Device defective If a fault develops please send the device to your SIEMENS service center for repair Repairs on site are not possible ...

Page 28: ...Maintenance and troubleshooting SCALANCE X005 X005TS 28 Operating Instructions 07 2014 C79000 G8976 C344 01 ...

Page 29: ...binations per length range 0 85 m Max 85 m IE FC TP Marine Trailing Cable with IE FC RJ45 Plug 180 Max 75 m IE FC TP Marine Trailing Cable 10 m TP Cord via IE FC RJ45 Outlet 0 100 m Max 100 m IE FC TP Standard Cable with IE FC RJ45 Plug 180 Max 90 m IE FC TP Standard Cable 10 m TP Cord via IE FC RJ45 Outlet Electrical data Power supply Voltage range 18 to 32 VDC Safe Extra Low Voltage SELV Rated v...

Page 30: ...styrene PPE PS plastic Weight 550 g Dimensions W x H x D 44 x 125 x 124 mm Installation options Mounting on a DIN rail Mounting on an S7 300 standard rail Wall mounting Switching properties Aging time 375 seconds Max number of learnable MAC addresses 1024 Response to LLDP frames Blocking Response to spanning tree BPDU frames Forwarding QoS priority queues 2 Note The number of connected SCALANCE X ...

Page 31: ...ply to the SCALANCE X005 and SCALANCE X005TS EMC directive The devices meet the requirements of the EC Directive 2004 108 EC Electromagnetic Compatibility Area of application The devices are designed for installation in an industrial environment Area of application Requirements for Emission Immunity Industrial area EN 61000 6 4 2007 A1 2011 EN 61000 6 2 2005 AC 2005 Installation Guidelines The dev...

Page 32: ...n of conformity relating to the EC Machinery Directive 2006 42 EC for these devices If the devices are part of the equipment of a machine they must be included in the declaration of conformity procedure by the manufacturer of the machine 8 2 Note for Australia C Tick The product meets the requirements of the AS NZS 2064 standard Class A 8 3 Notes on the cULus approval cULus Approval for Informatio...

Page 33: ...test of the SCALANCE X005TS The IE switch SCALANCE X005TS was tested according to EN 60068 2 64 Testing accuracy IEC 60721 3 5 Severity level Class 5M2 for road vehicles 8 6 Overvoltage test of the SCALANCE X005TS The SCALANCE X005TS IE switch has passed further overvoltage tests Power supply 24 VDC Overvoltage test with 36 V 1s 100 V 1ms with a source resistance of 10 ohms 8 7 Mechanical stabilit...

Page 34: ...Approvals 8 7 Mechanical stability in operation SCALANCE X005 X005TS 34 Operating Instructions 07 2014 C79000 G8976 C344 01 ...

Page 35: ...SCALANCE X005 X005TS Operating Instructions 07 2014 C79000 G8976 C344 01 35 Dimension drawings 9 Figure 9 1 Dimension drawing rear of SCALANCE X005 or SCALANCE X005TS ...

Page 36: ...Dimension drawings SCALANCE X005 X005TS 36 Operating Instructions 07 2014 C79000 G8976 C344 01 Figure 9 2 Dimension drawing side view of SCALANCE X005 or SCALANCE X005TS ...

Page 37: ...d rail 24 Wall mounting 24 I IE FC RJ 45 Plug 180 24 Installation 24 Plugging in 25 Pulling 25 Installation Types of installation 17 Insulation between the TP ports 14 L LEDs Port LEDs 15 Power LED 15 M MDI MDI X autocrossover function 14 Mounting Installation on a DIN rail 18 Installation on a standard rail 20 Wall mounting 21 N Network topology 9 Star topology 9 Noise test 33 O Order numbers 5 2...

Page 38: ...J 45 13 S SCALANCE X005 12 SCALANCE X005TS 12 SIMATIC NET glossary 6 Switching properties 30 T Technical specifications 29 Connector 29 Design dimensions and weight 30 Electrical data 29 Order numbers 29 Permitted ambient conditions 29 Permitted cable lengths 29 Switching properties 30 ...

Reviews: