Connecting up
4.6 Fitting the IE FC TP standard cable 4 x 2 GP to an IE IP 67 hybrid connector
SCALANCE W788-xPRO/RR / SCALANCE W74x-1PRO/RR
100
Operating Instructions (Compact), Release 08/2007, A5E00413342-05
4.6
Fitting the IE FC TP standard cable 4 x 2 GP to an IE IP 67 hybrid
connector
Procedure
Remove the two inner shells of the universal sealing ring
to adapt it to the diameter of the hybrid cable.
Push the bushing, washer, adapted universal sealing
ring and the housing over the cable jacket.
25 mm
30 mm
Remove the following lengths of cable jacket and shield
braid:
•
25 mm for the power leads
•
30 mm for the data leads
To achieve good shielding, the shield braid must be alt
least 30 mm long.
Arrange the data leads according to the color codes on
the splice element. The following table shows the
assignment of the data leads.
Wind the shield braid around the data leads. As a result,
the shielding of the cable has contact to the shield plate
of the splice element that will be fitted later.
Summary of Contents for SCALANCE W744-1PRO
Page 6: ...vi Betriebsanleitung kompakt SCALANCE W786 A5E00413342 05 ...
Page 10: ......
Page 14: ......
Page 74: ......
Page 78: ......