SATURN
EPABX
Installation Test Procedures
1, May 1936
Table 5.00 Loading Procedures for Operating Disk
S T E P
PROCEDURE
IF
IS NOT OBTAINED
5
If the operating disks that were load-
ed did not contain a Siemens-.
prepared data base, refer to SATURN
EPABX Data Base Preparation prac-
tice to define the particular system
data base, and the SATURN EPABX
Customer Memory Update Proce-
dures practice to input the
d e p e n d e n t d a t a t o t h e s y s t e m
memory.
Table 5.01
DIP Switch Settings
CAUTION:
removing
PCB to set switches, place BASIC
circuit
on
to the off
position. After replacement of
PCB, place circuit breaker
to
on (up) position.
SWITCH
NUMBER
SWITCH ON (CLOSED)
SWITCH OFF
1
Maintenance/ Test
Normal
2
Not Used
Not Used
Baud Rate (see note)
Baud Rate (see
5
One Stop Bit
Two Stop Bits
6
Odd Parity
Even Parity
7
Parity Disabled
Parity Enabled
8
Seven Bits
Eight Bits
NOTE: The following are the baud rate combinations for switches 3 and 4.
BAUD RATE
OFF
OFF
3 0 0
ON
OFF
1 2 0 0
OFF
ON
2 4 0 0
O N
ON
9 6 0 0
5 - 3