
INTRODUCTION SD39RIO-1
January 2001
1-6
1.4 Related Literature
The following documents are available to complement the installation, configuration, and maintenance of the
Remote I/O Rack. Generally, all needed documentation is supplied with your equipment. It may be supplied
in electronic form in the Adobe
portable document format (PDF), printed form, or both. Refer to these
documents as needed or as called for in text. Documents may be located on your workstation’s hard drive or
on a CD supplied with your system.
•
Grounding Practices Installation and Service Instruction
(document number SD39GND-1)
•
MODULPAC 2000 Installation and Service Instruction
(document number SD39MODULPAC-2)
•
Power Supply Rack (POWERAC) Installation and Service Instruction
(document number
SD39PSR-1)
•
SIXRAC Installation and Service Instruction
(document number SD39SIXRAC-1)
#
Summary of Contents for QUADLOG
Page 2: ......
Page 16: ...INSTALLATION SD39RIO 1 January 2001 2 4 Figure 2 2 Remote I O Rack Dimensions ...
Page 29: ...SD39RIO 1 INSTALLATION January 2001 2 17 Figure 2 11 W2072 Cable End Preparation ...
Page 34: ...INSTALLATION SD39RIO 1 January 2001 2 22 Figure 2 14 W2040 Cable End Preparation ...
Page 39: ...SD39RIO 1 INSTALLATION January 2001 2 27 Figure 2 17 Belden 8627 Cable End Preparation ...
Page 54: ...INSTALLATION SD39RIO 1 January 2001 2 42 Figure 2 31 Rack and I O Module Keying ...
Page 64: ...SPECIFICATIONS SD39RIO 1 January 2001 6 4 ...
Page 66: ......