5 - 1
Siemens-Elema AB
SPR8-220.091.01
Page 1 of 2
MOBILETT Plus HP
Solna, Sweden
Rev. 03
03.03
SPS-UD
Service
Supplement to Service Instructions
5
•
Max preparation time is increased from 10 s to 20 s.
•
The service programs P05 (Automatic maintenance test), P12 (Inverter and single tank
test) and P13 (Inverter test) are removed.
•
Only for MOBILETT Plus HP - The service program P11 (Backup battery test) is
removed.
List of test programs available in service mode
5
P02 - Rotation test
5
(Wiring diagram X037E, page 150)
Accelerates the anode with a 160 Hz control signal during two seconds. After this first
acceleration, the speed is measured and if necessary, a second acceleration of two sec-
onds is performed. When the correct speed is reached, the anode will rotate freely for 20
seconds or until the rotation frequency is below 142 Hz before it is braked during 9 sec-
onds to a stop. An error message will be displayed after two unsuccessful attempts to
accelerate the anode or if the anode looses speed too fast. When the test is activated, the
display shows:
After acceleration, the display shows the actual rotation frequency:
kV
mAs
Rot tESt = Rotation test
kV
mAs
Rot 143 = Rotation frequency 143 Hz: Normal value 158 Hz. Min. value 142 Hz.
Summary of Contents for MOBILETT Plus HP
Page 25: ......