
28
Installing the system components
MAMMOMAT Novation
SPB7-250.812.03.02.02
Siemens AG
08.04
CS SD 24
Page 28 of 36
Medical Solutions
Bolting the stand/radiation shield to the floor
0
Should a permanent fastening to the floor be required due to local regulations (for exam-
ple in areas subject to earthquakes) or due to the quality of the floor covering, the
stand/radiation shield can be bolted to the floor by means of safety dowels and screws.
When bolting the stand/radiation shield to the floor, the fixing screws shall pass through
the hollow levelling screws
and
.
NOTE
Cable lead-in from the floor only on-the-floor calbe conduits in-
cluded in the shipment cannot be used. For on-the-floor cable co-
duits
(Factory adjustments / p. 8)(Protective measures / p. 9)
Fig. 20: Base plate for the stand
Pos. 1
screws
Pos. 2
Cable lead-in from the floor left or right. Obtain cable conduits on site.
Pos. 3
Slots for cable lead-in