en
Installation
14
5
Installation
Installation
Fitting the upper support frame
1.
Before fitting, determine the total height of the
support frame and mark the screw holes.
Note:
The height of the support frame can be
adjusted in 20 mm intervals.
2.
On the ceiling, mark the centre point of the
appliance.
3.
Using the enclosed template, mark the positions for
the screws on the ceiling.
4.
Drill four 8 mm diameter holes to a depth of 80 mm
for the fasteners and press in the wall plugs flush
with the ceiling.
5.
Fasten the upper part of the support frame to the
ceiling with 4 screws.
Note:
Ensure that the support frame is in the correct
position. The middle bracket defines the preferred
side and must be facing the hob control elements.
Fitting the lower support frame
Fasten the upper and lower part of the support frame at
the specified total height using 10 screws.
Notes
■
Ensure that the lower support frame is in the correct
position. The open side must be facing the hob
control elements.
■
The support frame can be subsequently re-
positioned by loosening the securing screws.
[
[
[
([KDXVWDLU
PP
&LUFXODWHGDLU
PP
[
Summary of Contents for LF97GBM50B
Page 1: ...Extractor hood en Instructions for installation and use ...
Page 2: ......