![Siemens LC 85 K 950 Operating And Installation Instructions Download Page 25](http://html.mh-extra.com/html/siemens/lc-85-k-950/lc-85-k-950_operating-and-installation-instructions_384879025.webp)
Installation
This extractor hood
is intended to be
mounted onto the kitchen wall.
Open glass aperture.
1.
Remove the grease filter (refer to
operating; Instructions).
2.
Draw a line on the wall from the ceiling to
the lower edge of the hood at the centre of
the location where the hood is going to be
mounted.
Ensure that the minimum distance between
the hob and the extractor hood is maintained
-
400 mm
for an electric hob and
550 mm
for a gas hob.
1.)
When using the drilling
template, please ensure that the clearance
between the bottom edge of the hood
body and the bottom edge of the drilling
template is 755 mm (see Fig. drilling
template).
3.
Drill 2x 6 mm ø holes for the upper fixing
bracket.
4.
Hole (diameter 10mm) for the attachment
of the exhaust hood.
Tower
Holder
Wall Fastener
Connection
for Hose
5.
Please be certain to center the exhaust
hood over the cooking area.
6.
Drill the holes and insert suitable screw
anchors flush.
7.
Attach suspension (tower holder angle)
to the upper tower.
8.
Screw machine screws into the screw
anchors (Ø10 mm) until they protrude by
about 20mm.
9.
Hang the exhaust hood on the upper
attachment points and loosely fasten it
using the washers and nuts.
10.
Align the exhaust hood (inspect the
installation) and tighten the nuts.
11.
Additionally secure the exhaust hood with
two additional screws.
en
400
20
0
30
0
Summary of Contents for LC 85 K 950
Page 2: ......
Page 13: ...de Bohrschablone ...
Page 15: ......
Page 26: ...en Installation Drilling template ...
Page 38: ...fr Encastrement Gabarit de perçage ...
Page 50: ...nl Inbouwen Boorsjabloon ...
Page 62: ...Montaggio Sagoma di foratura it ...
Page 74: ...Montaje Plantilla para taladrar es ...