Siemens FCM2041-U3 Installation Instructions Manual Download Page 6

Siemens Industry, Inc.
Building Technologies  Division

A6V11231630_en--_b

6

Configuration dialog will display information on the PMI firmware and
system configuration currently stored in the panel. You can select the
configuration to upload (if there are multiple compiled configurations
in the host PC), and also choose to download the PMI’s current
history file into the project directory.

ii) Once you have begun the transfer, the Transfer Progress dialog

displays transfer progress and status messages, and allows you to
cancel the transfer. When you click OK at the transfer complete
message, the control panel will reset itself with the new configuration.

ELECTRICAL RATINGS

r

e

w

o

P

t

u

p

n

I

r

e

w

o

P

t

u

p

t

u

O

t

n

e

r

r

u

C

e

n

a

l

P

k

c

a

B

V

4

2

A

m

5

9

1

d

n

a

T

E

N

X

/

T

E

N

H

h

c

a

E

r

i

a

P

k

r

o

w

t

e

N

N

A

C

.

x

a

m

k

a

e

p

o

t

k

a

e

p

V

8

t

n

e

r

r

u

C

V

4

2

l

a

n

i

m

r

e

T

w

e

r

c

S

0

.

g

s

m

g

n

i

r

u

d

(

.

x

a

m

A

m

5

7

)

n

o

i

s

s

i

m

s

n

a

r

t

t

n

e

r

r

u

C

e

n

a

l

P

k

c

a

B

V

2

.

6

0

t

n

e

r

r

u

C

y

b

d

n

a

t

S

V

4

2

A

m

5

2

1

Summary of Contents for FCM2041-U3

Page 1: ...2041 U3 contains a full VGA LCD Touch Screen and LEDs for displaying system status An audible sounds when there are unac knowledged events on the FCM2041 U3 The display is surrounded by keys that are used to control the displayed information and to navigate through these screens Keys are also provided to obtain help and to enter into the menu features of the FCM2041 U3 Refer to Figure 1 On the bac...

Page 2: ... s e r d r a h r o f s d n o c e s 5 d l o H 2 1 D S I M P G e r o t s o t d e s u t r o p d r a c D S n o i t a m r o f n i p u k c a b d n a e s a b a t a d 2 D S I M P G w o l l a o t d e s u t r o p d r a c D S y t i l i b a p a c S U T A T S l a m r o n e t a c i d n i o t t h g i l s t n e m g e s g n i k l a W n a f i d e y a l p s i d s i e d o c r o r r E n o i t a r e p o d e t c e t e d...

Page 3: ... t e N T E N X I M P n o g n i t t e S h c t i w s s n o i t p O 4 S n o g n i t t e s o N t i g i d o w t e h t o t s s e r d d a e d o n T E N X e h t t e S s u e Z n i t i r o f d e n g i s s a s s e r d d a s u e Z n i g n i t t e S m o r f s s e r d d a e d o n t i g i d o w t T E N X e h t t e S o t e r u s e B e e r t l a c i s y h p s u e Z e h t n i 4 6 1 0 s o r e z g n i d a e l t e s M...

Page 4: ...vents are acknowledged a reset button becomes available in the lower right side of the display If notification appliances were active two additional buttons appear at the bottom of the screen These allow the operator to silence or unsilence the notification appliances When the notification appliances are silenced the Audibles Silenced LED lights The system can only be reset with the notification a...

Page 5: ...s tool replace the PMI with the new FCM2041 U3 Please make sure you are converting the correct PMI with a FCM2041 U3 by match ing the address of the switches on the back of the PMI a In the configuration which you have just removed from the original PMI click on the PMI module in the physical tree Select the Edit menu and click on Find ReplaceTree Node A dialog box will open and allow you to repla...

Page 6: ...sfer theTransfer Progress dialog displays transfer progress and status messages and allows you to cancel the transfer When you click OK at the transfer complete message the control panel will reset itself with the new configuration ELECTRICAL RATINGS r e w o P t u p n I r e w o P t u p t u O t n e r r u C e n a l P k c a B V 4 2 A m 5 9 1 d n a T E N X T E N H h c a E r i a P k r o w t e N N A C x...

Page 7: ...needs Such a security concept may result in additional site specific preventive action to ensure that the building comfort fire safety security management or physical security system for your site are operated in a secure manner These measures may include but are not limited to separating networks physically protecting system components user awareness programs defense in depth etc For additional i...

Page 8: ...nc Building Technologies Division Florham Park NJ Siemens Canada Ltd 1577 North Service Road East Oakville Ontario L6H 0H6 Canada Document ID A6V11231630_en _b This page has been left intentionally blank P N A5Q00075185 ...

Reviews: