
Leak detection
Attention !
After the gas pipeline connection has been completed, the
leak detection test must be performed by registered gas
installer who employed by registered gas contractor.
Smear the suds on each connection part with a soft brush,
and then open the gas valve to check carefully if bubbles
appear, please close the gas valve immediately, and adjust
the air inlet connection until no bubbles appear.
Connection electrical source
The electrical source is fixed in the middle of bottom, when
you use it, please confirm it is safety and grounded.
Please confirm the hob wire are grounded, it is used
attached a tri-pins, and the tri-pins are grounded, when it is
creepage, the setting can prevent human from getting an
electric shock.
We suggest the flashboard is fixed on the right underside, be
far away from the gas and air inlet.
Installation
13
Gas leak detection
Plug into socket
≈100mm
≈900mm
surface
size of tapping 880±2mm
Summary of Contents for ER94331HK
Page 1: ...BUILT IN GAS HOBS INSTALLATION AND OPERATION INSTRUCTION en ER94351HK ER94331HK ER95351HK ...
Page 2: ......
Page 18: ...Installation 15 ER94351HK ER95351HK ER94331HK ...
Page 28: ......
Page 30: ......
Page 31: ......
Page 32: ...Material Number 9000834945 Version 03 Production License Code XK21 007 00819 ...