CM LON
LOGO! Expansion Module
CM LON
12
J31069-D1263-U002-A2-7618
3.
Putting the CM LON into operation
A LONMARK certified application was loaded into the CM
LON at the factory. Other applications can – where available
– also be loaded.
3.1
Step-by-step
1. Interrupt the voltage to the LOGO!.
(The LOGO! and its modules do not have power
switches.)
2. Mount the CM LON
3. Connect the power supply to the CM LON.
4. Connect the LON bus lines to the CM LON.
5. Remove the label with the Neuron-ID from the CM LON
and stick it on the network plan at the CM LON's installed
location. (The Neuron-ID is also given as a bar code on
the label.)
6. Apply power to the LOGO! and CM LON.
A
B
LON
X 2
3 4
RUN/STOP
BUS
6BK1 700-0BA10-0AA0
Service
7. If multiple CM LONs have been installed, repeat Steps 1
to 6 for each CM LON.