PROFIBUS MODULE (CB15/CB155)
English
Operating Instructions
1
Contents
Warning and Caution Notes
1.
OVERVIEW
1.1 Description and Features
1.2 Application on a PROFIBUS Link
2.
INSTALLATION
2.1 Installing the Module
2.1.1 CB15 Installation
2.1.2 CB155 Installation
2.2 Connecting the Bus Cable
2.2.1 Terminals
2.2.1.1 CB15 Terminals
2.2.1.2 CB155 Terminals
2.2.2 Bus Cabling
2.3 EMC Measures
2.3.1 Shielding
2.3.2 Equipotential Bonding
2.3.3 Cable Installation
2.4 PROFIBUS-DP Bus Termination
2.5 Front Panel
3.
OPERATING INFORMATION
3.1 Local Control
3.2 Remote Control
3.3 System Parameters
3.3.1 Parameters not Available via the CB15/CB155
3.3.2 Parameters Specific to the CB15/CB155
3.3.3 Hex Display for PROFIBUS on CB15
4.
FAULT CODES
5.
COMMISSIONING
5.1 Data Communication via PROFIBUS-DP
5.1.1 Parameter Area (PKW)
5.1.2 Process Data Area (PZD)
5.1.2.1 Control Word (STW)
5.1.2.2 Status Word (ZSW)
5.1.2.3 Main Setpoint (HSW)
5.1.2.4 Main Actual Value (HIW)
5.1.3 Watchdog Timeout
5.2 Settings on the PROFIBUS-DP Master
5.2.1 Setting the PPO Type from the Master
5.2.2 Setting the PPO Type on the CB15/CB155
5.3 Initial Communication with the CB15/CB155
6.
PROFIBUS TROUBLESHOOTING
6.1 Diagnostic Parameters
6.2 Diagnostics with a Class 2 Master