42
3D Reconstruction Upgrade Part 2
ARCADIS Orbic
SPR2-320.814.02.01.02
Siemens AG
01.05
CS SD 24
Page 42 of 46
Medical Solutions
Fig. 44: Connecting the terminal block
•
Clamp the red cable of the coupling unit to terminal block 3.
•
Clamp the blue cable of the coupling unit to terminal block 4.