
INSTALLATION
_________________________________________________________________________________________________________
3-4
COM-00-21-04 OCTOBER 2021
Version No.: A.1
3.3
Mechanical Installation
3.3.1 Mounting Procedure
Mounting brackets are provided for attaching the Airlink Venus enclosure to a vertical flat
surface. Note that Airlink Venus has a passive cooling system and as such, the external cooling
fins should not be blocked. Provide adequate airflow around the radio enclosure, maintaining a
minimum 2” clearance from the front, sides, top, and rear surfaces.
The Airlink Venus radio can be mounted with either the connectors facing right, left, or down.
(Up is possible, but not recommended to avoid ingress of dust and other foreign matter). Fasten
the radio using four #12 (M5) screws with washer and lock-washer to a flat and level surface
using the mounting brackets provided. See Figure 3-1.
RF antenna and GPS antenna are not included with the Airlink Venus radio. Antennas should be
installed by qualified personnel and care should be taken with its grounding and connection to
coaxial cable.
Figure 3-2 Mounting Dimensions – Ventilation Allowances