CABLE ENTRY OPENIN
G
Figure 9-3: Reinforced Stool – LEFT HAND SIDE VIEW
2.
Working from back to front, gland these SWA cables to the CET plate, using the
holes and notches provided, in the following order:
o
UPS Fault / Alarm relay contact cable (if required)
o
Battery Expansion 54Vdc cable (if required)
o
Controller 230Vac feed cable
o
DNO 230Vac supply cable
o
Ethernet cable (if required)
NOTE:
Leave enough slack on all cables for termination at the top of the
cabinet. Cables should extend a minimum of 1500mm from the glanding point.
NOTE:
When fitting the Battery Expansion Cable, terminate the Green/Yellow
core to the main earth stud on the CET plate.
9.4 Fitting the Vented Cabinet Outer Case and Sealing the Base
Step No.
UPS Cabinet
Battery Expansion Cabinet
Refer to
3
Fit the Vented Cabinet Outer Case and seal the base
Section 9.4
The Vented Cabinet Outer Case is simply a modified ST900 style controller cabinet and
is fitted to the stool in exactly the same way.
NOTE:
The Vented Cabinet is packaged with the fixings necessary for fitting
the solutions housing modules (Battery, DC and UPS). Retain fixings until
reaching the appropriate installation step.
1.
Fit the Vented cabinet outer case to the reinforced stool using the appropriate
M10 fixings as with the ST900 cabinet outer cases. Refer to 667/HE/45950/000.
2.
The cabinet base should now be sealed. See 667/HE/45950/000 for details.
NOTE:
Further installation from this point may involve work above un-cured
base seal. It is therefore recommended to mask the openings stool top with
cardboard or similar to prevent the loss of dropped fixings.