Transport, storage and packing
9229 9947 176 0C
9
2013-03-28
• Set the vacuum circuit-breaker down onto the square timbers.
• Hang further sling gear into the transport boreholes.
• Transport to installation site or suspended from crane for further work steps.
Fig. 8
Positioning the square timbers and setting
down the vacuum circuit-breaker
Fig. 9
Transporting without pallet
Note
Keep accessory pack on hand for the installation.