SIDESHIFT INSTALLATION GUIDE
V1.9
9
STEP 3:
FEED THRUSTER CABLES THROUGH DECK AND CONNECT
TO BATTERY SWITCH, FUSE AND MOTOR CONTROL
MODULE(REFER TO SCHEMATICS ON PG 10/11)
Determine a location for the motor control module and thruster batteries in a dry
storage area close to the thruster.
Using a 1 ¼” hole saw, drill holes at appropriate locations for routing of the thruster
cables.
Feed the thruster cables into the storage location.
Connect the motor control cables to a dedicated 12v(HB340) or 24v (HB350) battery
bank(see page 11).
WARNING
: Verify that hole placement will not interfere with or damage
anything when drilling through the deck and storage location, and
that there is sufficient space so that cables can be accessed after
passing through the proposed hole location.
WARNING
: Ensure the control module is located in a dry storage area