15
5693
11
2020
-
SE60/185 s2
MG_0027
Tunnel
centre line
Boats
centre line
Bow
Stern
1
STARBOARD
BOW
Tunnel
centre line
Boats
centre line
B
ØC
ØA
Measurement
Description
mm
inch
ØA
30
1.18
B
23 0.91
ØC
9
0.35
SE
*P*IP
50
SE
*P*IP
60
BOW
BOW
Place top motor
bracket and bolt plate
Measure the drive
shaft has come
through the motor
bracket at the correct
height with the
template supplied.
Gasket
Ensure propeller
turns without
obstruction
Motor bracket
Bolt plate
5
BOW
BOW
Apply MS Polymer
sealant or equal to
both sides of the
gasket
Motor bracket
IMPORTANT
Do not apply sealant
to the holes.
6 - 7
2 - 4
8
Fasten bolts
18Nm (13.28 lb/ft)
*P- Propositional
*IP- Ignition Protected
It is the installers responsibility
When installing Side-Power equipment to follow the outlined regulations/ classifi cation rules (electrical/ mechanical) according to
international or special national regulations. Instructions in this guide cannot be guaranteed to comply with global electric/ mechanic
regulations/ classifi cation rules.
To follow all health and safety laws in accordance with their local outlined regulations/ classifi cation rules.
Before installation, it is important that the installer reads this guide to ensure necessary acquaintance with this product.
The recommendations made in this manual are guidelines ONLY, and Sleipner Motor AS (Side-Power) strongly recommend that
before installation, advice is obtained from a naval architect familiar with the particular vessel and regulations/ classifi cations.
This manual is intended to support educated/ experienced staff and is therefore not suffi cient in all details for professional
installation.
(NB: These instructions are only general instruction. If you are not skilled to do this work, please contact professional
installers for assistance.)
All electrical work must be done by a licensed professional.
Faulty installation of Sleipner products will render all warranty given by Sleipner Motor AS void.
MC_0038
MC_0257
Thruster Installation Considerations and Precautions
EN
Before installation, it is important that the installer reads this guide to ensure necessary acquaintance with this product.
• The electro motor must be handled with care. Do not lift it by internal cable connections, main terminals or placed down on the drive shaft.
• The thruster power supply circuit must include the recommended sized fuse and a battery isolation switch.
• Never run the thruster out of water.
• It is important to follow the guidelines in this manual. Failure can result in severe damage to the thruster.
MC_0258
Gear Leg & Motor Bracket Installation
!
Please refer to the graphic for special considerations relating to your model
!
EN
1. Mark the tunnel centreline and the boat’s centreline.
(NB: Install the gear leg and propeller as shown above for the thrust direction to
correspond with the control panel.)
2. Use the gasket or template (recommended) to mark the hole centres and double-check the measurements. One hole MUST be placed using the
boat centreline as shown above.
(NB: All holes must be in-line with the tunnels’ centreline for correct installation, clearance between the
propeller and the tunnel is minimal.)
3. Smooth the surface of the tunnel. A rough surface will cause possible failure/ movement of the gear leg. The motor bracket must rest steadily on
the tunnel.
4. Drill the main centre hole followed by the two screw-holes.
5. Place the gear leg (without the propeller) with the gasket on inside the tunnel. Place the propeller on the gear leg to ensure it is centred and rotates
freely with the same clearance from each blade to the tunnel wall. Place top motor bracket to measure the drive shaft has come through the motor
bracket at the correct height. Remove the gear leg and propeller for fi nal installation.
6. Apply appropriate sealant to both sides of the gasket and place on the gear leg. Place the gear leg in the tunnel (without the propeller).
7. Install the top motor bracket and gear leg gently together. Use appropriate sealant to ensure that no leakages occur.
(NB: See your sealant data
sheet for the correct application process.)
8. Fasten the gear leg and the motor bracket with the bolts provided. Tighten to torque as shown above.