![Side-Power SAC240 Series Installation Manual Download Page 2](http://html1.mh-extra.com/html/side-power/sac240-series/sac240-series_installation-manual_1264828002.webp)
SAC513/SAC610
SAC_Thrusters_ABB_v1_3_April 2014
2
Innhold
NO
INSTALLATION INSTRUCTIONS
Measurements ....................................................................... 3-4
Technical specifications .......................................................... 5-6
Planning & important precautions.............................................. 7
Tunnel installation
Positioning of the tunnel / thruster ............................................ 8
How to shape the tunnel ends ................................................... 9
How to prevent drag from tunnel installation ........................... 10
Possible tunnel installation in sailboats ................................... 11
Series production installation................................................... 12
Tunnel installation in a GRP boat ............................................ 13
Thruster installation
Positioning the thruster motor.................................................. 15
Gearhouse and motorbracket ............................................ 16-18
Propeller ............................................................................. 19-21
AC motor ........................................................................... 22-23
Oil tank .................................................................................... 24
Electrical installation
Schematic overview..................................................................25
Wiring diagram .........................................................................26
PDC 101 Proportional Drive Controller.....................................27
Varriable Frequency Drive ........................................................27
Power cable dimensions...........................................................28
Maintenance & service
...........................................................29
Checklist for control of the installation ..................................... 30
Important user precautions
...................................................31
Warranty statement
.............................................................. 31
Service centres
..................................................................... 32
Contents
EN
DECLARATION OF CONFORMITY
We,
Sleipner Motor AS
P.O. Box 519
N-1612 Fredrikstad, Norway
declare that this product with accompanying
standard remote control systems complies with
the essential health and safety requirements
according to the Directive 89/336/EEC of 23
May 1989 amended by 92/31/EEC and
93/68/EEC.
2
INSTALLASJONSVEILEDNING
Mål ........................................................................................ 3-4
Tekniske spesifikasjoner ........................................................ 5-6
Planlegging og viktige hensyn ....................................................7
Tunnelinstallasjon
Plassering av tunnel/truster ...................................................... 8
Hvordan forme tunnelendene .................................................... 9
Hvordan forhindre motstand fra tunnelinstallasjon .................. 10
Alternativer for installasjon i seilbåt ......................................... 11
Installasjon ved serieproduksjon ............................................. 12
Tunnellinstallasjon i en glassfiberbåt ....................................... 13
Trusterinstallasjon
Plassering av thrustermotor..................................................... 15
Girhus og brakett ............................................................... 16-18
Propeller ............................................................................ 19-21
AC motor og kobling .......................................................... 22-23
Oljetank ................................................................................... 24
Elektrisk installasjon
Skjematikk ................................................................................25
Koblingsskjema ........................................................................26
PDC 101 Proportional Drive Controller.....................................27
Varriable Frequency Drive ........................................................27
Dimensjoner, hovedkabel .........................................................28
Service og vedlikehold
...........................................................29
Sjekkliste for kontroll av installasjonen .................................... 30
Viktige forhåndsregler
...........................................................31
Servicesentere
...................................................................... 32
SAMSVARSERKLÆRING
Vi , Sleipner Motor AS
Postboks 519
N -1612 Fredrikstad,Norge
erklærer at dette produktet med tilhørende
standard kontrollsystemer er i samsvar med
helse, og sikkerhetskravene i henhold til Direk-
tiv 89/336/EEC fra 23 Mai 1989, korrigert av
92/31/EEC og 93/68/EEC.