Material required
•
Fast curing epoxy resin two-component adhesives
Steps
1.
Glue the two spacer bolts supplied onto the flange fixture of the sender/receiver
unit each at a distance of 85 mm from the center.
2.
Seal the two unused mounting holes in the center of the weather hood with
dummy screws.
3.
Place the weather hood on the sender/receiver unit.
✓
The threads of the spacer bolts protrude through the front mounting holes of the
weather hood.
4.
Secure the weather hood in position with the two knurled nuts.
7.11
Starting measuring operation
NOTE
The device is delivered from the factory with the parameter settings specified by the
customer when ordering. When these parameter specifications match the parameters
during commissioning, measuring operation can be started after fine optical alignment.
The device can be configured to meet the plant conditions when required.
Steps
Starting measuring operation
1.
Press button “Meas”.
✓
The device switches to Measuring mode.
Check status LEDs, malfunction and warning messages.
NOTE
Quick check of Measuring screens on the LC display of the control unit:
b
Using the Operating Instructions,
see "Operating and display elements", page 47
.
When malfunction or warning messages are present:
b
If the error cause cannot be cleared: Contact SICK Service.
7.11.1
Operating states
Message on display
Meaning
DOWNLOAD
Download new software (for Service purposes only)
INIT
Intialization of control unit
INITIALISATION
Initialization of sender/receiver unit
MAINTENANCE
Maintenance mode (no measurement)
MEASURING
Measuring operation
MEASURING LD
Measuring operation; beam length tracked (line locking
done)
MEASURING LL
Measuring operation with active tracking of laser beam
length (line locking)
SIGNAL_ADJUST
Adjusting amplification to changed transmission
7
COMMISSIONING
46
O P E R A T I N G I N S T R U C T I O N S | GM35
8009389/147I/V4-0/2021-03 | SICK
Subject to change without notice