background image

BUNN PCBA User Manual

8 / 8

AT+2

Request to start LED

AT+2-ok

AT+2-fail

Success

Fail

AT+3

Request to stop LED

AT+3-ok

AT+3-fail

Success

Fail

AT+4

Request to connect Ethernet

AT+4-ok

AT+4-fail

Success

Fail

AT+6

Request to R/W SD through MT3620

AT+6-ok

AT+6-fail

Success

Fail

AT+7

Request to get MAC of BLE

AT+7+MAC

Success

AT+8

Request to get power down information

AT+8-ok

AT+8-fail

Power down

Power on

AT+9

Request to R/W SD through PC

AT+9-ok

AT+9-fail

Success

Fail

AT+0

Request to R/W USB through PC

AT+0-ok

AT+0-fail

Success

Fail

AT+d

Request to open watch-dog

AT+d-ok

AT+d-fail

Success

Fail

Table 1 AT commands

4 Support

Contact:
1. Email: [email protected]
2. Phone: 1-408-970-0349
3. Address: 3945 Freedom Circle, Suite 320, Santa Clara, CA 95054

5 FCC ID Label

Summary of Contents for NRF52810

Page 1: ...BUNN PCBA User Manual 1 8 User Manual Sichuan AnSphere Technology Co Ltd...

Page 2: ...BUNN PCBA User Manual 2 8 Revision History Version Description Author Date V0 1 Initial version Juan He 11 30 2021 V0 2 Complete instructions Juan He 7 12 2021...

Page 3: ...BA User Manual 3 8 Contents 1 Instruction 4 2 Components 4 2 1 Hardware list 4 2 2 Software list 4 3 Operation steps 4 3 1 Hardware preparation 4 3 2 Software preparation 5 3 3 AT command debug 7 4 Su...

Page 4: ...ating ambient temperature range 30 C to 70 C 22 F to 158 F Operating ambient humidity 10 95 2 Components 2 1 Hardware list Item Number Description BUNN 1 Main product Debug Dongle cable optional 1 Azu...

Page 5: ...d to BUNN 3 Insert USB to BUNN 4 Connect Ethernet 5 Connect BUNN to PC through USB 6 Connect dongle to BUNN through mini HDMI Figure 1 Device interfaces Figure 2 UART Pins 3 2 Software preparation 1 F...

Page 6: ...3 formatting SD 2 Download images Download command 1 azsphere device sideload deploy force imagepackage G bunn_sd_singed imagepackage 2 azsphere device sideload deploy force imagepackage G lan enc28j...

Page 7: ...for debug 2 Configure serial tool 1 Port use the serial port 2 Parity None 3 Flow control None 4 Baud rate 115200 5 Data bits 8 6 Stop bits 1 Figure 5 SSCOM configuration 3 AT commands for debug AT c...

Page 8: ...equest to get MAC of BLE AT 7 MAC Success AT 8 Request to get power down information AT 8 ok AT 8 fail Power down Power on AT 9 Request to R W SD through PC AT 9 ok AT 9 fail Success Fail AT 0 Request...

Page 9: ...be power off 3 Make sure the module pins correctly installed 4 Make sure that the module does not allow users to replace or demolition 1 4 Trace antenna designs Not applicable 1 5 RF exposure consider...

Page 10: ...uct must make sure that FCC labeling requirements are met This includes clearly visible exterior label on the outside of the final product housing that displays the contents shown in below Contains FC...

Reviews: