Sices GC315 User And Installation Manual Download Page 4

GCxxxLink

–User and installation guide  

3

 

7)  Close the access cover by pressing in the vicinity of 

the latches (fig.7).

 

 

It is now possible supplying auxiliary circuits and 

MAINS/GENERATOR voltages 

INFORMATION

 

: Leave the swith on BATTERY OFF 

when  the  device  does  not  have  the  main  power 
supply (JD) and should not be used for a long time: 
this allows you not to unnecessarily discharge the 
internal battery. 

WARNING

: In the internal battery operating  state 

and in the absence of the main power supply (JD), 
the  device  is  not  able  to  manage  the    operation  of 
the genset. It must be left in OFF/RESET mode. 

 

 

 

Controller  LINK  have  two  LEDs  indicating  modem's 
operating states (Fig.6). 

LED light work’s behaviour as below: 

 

LED1  (Net)

:  yellow  LED  flashes  with  different 

modalities according to the connection status with the 
mobile network.

 

 

64ms ON and 800ms OFF: 

modem not registered to 

the mobile network.

 

 

64ms ON and 3000ms OFF

: modem registered to the 

mobile network. 

64ms  ON  and  300ms  OFF:

  modem  is  exchanging 

data on the mobile network. 

 

LED2  (Status): 

green  LED  indicates  whether  the 

module is on and ready to use. 

Both OFF

: the modem is off or in Power Save Mode. 

 

The 

GC315

Link

  e 

GC400

Link

 

controllers  can  be  supplied  optionally  with  a  Lithium  Ion  internal  rechargeable 

battery, which is able to ensure only its data transmission and localization for some hours in case of lack of 
the  main  supply.  The  recharge  happens  automatically  by  supplying  the  device;  the  full  charge  requires 
approximately 12 hours, after which the battery is in permanent buffer charge. 

The device operation time depends on several factors, such as the environment temperature, the data sending 
frequency  and  the  mobile  network  signal  intensity.  The  duration  of  the  battery  can  be  highly  increase  by 
activating  one  of  the  two  types  of  energy  saving.The  battery  is  activated/deactivated  through  the  switch 

D

 

(fig.6).. The internal battery can be recharged only when the device temperature is between 0°C and +50°C. 
If  the  battery  deactivates  the  recharge  cycle,  the  monitoring  is  carried  out  anyway.  Leave  the  swith  on 

BATTERY OFF

 when the device does not have the main power supply and should not be used for a long time: 

this allows you not to unnecessarily discharge the internal battery. 

 

 

The 

GC315

Link

 

GC400

Link

 

controllers can send alerts directly to a mobile phone via SMS (mobile originated 

SMS); to do so, the device can need to be programmed to send SMS to a specific phone. 
For the SMS  you can receive and for the commands you can send see the document 

EAAS0341xx Serial 

Comunication and SMS protocol. 

Summary of Contents for GC315

Page 1: ...GCxxxLink User and installation guide 1 Filename EAAM051205EN Rev 04 Date 28 02 2019 ID Document EAAM051205EN Product GC315Link GC400Link GC400Mains Link Link Link Mains Link ...

Page 2: ...r To receive status or signalling message via email using the Si Mo Ne platform It also present a system for detecting displacements composed of an accelerometer and a gyroscope If the generator is improperly moved the device will send a series of warning messages and coordinates acquired from the navigation system GNSS to the Si Mo Ne system so you can track the route on a map The devices can als...

Page 3: ... the device Remove the access cover that encloses the SIM holder the antenna connectors and the battery switch Insert a small screwdriver in the little retention hooks and make a slight leverage to remove the panel After opening the cover you will see the following parts his picture shows the inner part A SMA FEMALE connector for GSM LTE antenna B SMA FEMALE connector for GNSS antenna C SIMcard ho...

Page 4: ...s can be supplied optionally with a Lithium Ion internal rechargeable battery which is able to ensure only its data transmission and localization for some hours in case of lack of the main supply The recharge happens automatically by supplying the device the full charge requires approximately 12 hours after which the battery is in permanent buffer charge The device operation time depends on severa...

Page 5: ...CAT M and NB Iot P 0551 APN primary access Point Name P 0552 APN primary username optional P 0553 APN primary password optional P 0554 APN primary access Point Name P 0555 APN primary username optional P 0556 APN primary password optional P 0557 Connection mode 1 Stay connected P 0558 Modbus TCP enable 0 No P 0559 Modbus TCP port 502 P 0570 parameter configures the preferred Network Mode to 0 Auto...

Page 6: ...ows the HDOP value it is a precision indicator the lower it is the sharper the position Finally it the number of used satellites in every instant If there is no need of automatic localization or Tracking it is possible to disable the module and it is still possible to manually set the latitude P 0581 and longitude P 0582 of the generator set GSM LTE antenna 700 960 1710 2655 MHZ must be connected ...

Page 7: ...1 For alarms and deactivations 1 0002 For warning 2 0004 For engine started 3 0008 For engine stopped 4 0010 For mains mailur 5 0020 For mains presence 6 0040 For board operation mode 14 4000 For energy saving 16 8000 For diagnostic P 0542 parameter allows to choose if to send to server the connected voltage or phase measures The parameters used and the status information for the communication wit...

Page 8: ...wnload declarations of conformity The technical documentation of the device is available in the Download Area of our website www sices eu This document is owned by SICES s r l All rights reserved SICES s r l reserves the right to modify this document without prior notice SICES has made any effort to ensure that the information herein provide are correct in any case SICES does not assume any liabil...

Reviews: