64
Operator’s manual
77
60
5
Work environment conditions
- Relative humidity: from 30% to 95% without condensation.
- Temperature range: from 0°C to 40°C.
INSTALLATION
After unpacking, position the parts ready for assembly. During the handling phase, neces-
sary to find the right positioning of the lift on the ground, suitable slings or chains must
be used (fig. 6).
Once the exact position of the lift has been established place the control unit. The stand-
ard positioning is the one shown in figure 7, with the control unit on the left of the lift
and its control panel oriented on the other side of the lift. This will allow the operator a
good view of the whole working area.
The positioning distances are shown in figure 7, assuming as reference the front left
corner of the runway.
Summary of Contents for PSR 43 CT LT
Page 14: ...68 Operator smanual 8_1...
Page 31: ...UK Operator smanual 85 YV6 A PM B1 YV5 B2 YV3 YV4 17 YV4 YV3...
Page 41: ...UK Operator smanual 95 19 1 5 3 2 4 YV9 YV6...
Page 43: ...UK Operator smanual 97 19_1...
Page 45: ...UK Operator smanual 99 YV12 VCP1 YV8 CIL LT DX YV7 CIL LT SX VCP2 YV10 YV11 20...
Page 47: ...UK Operator smanual 101 20_1 YV12 VCP1 VCP2 YV7 YV8 CIL LT SX CIL LT DX YV10 YV11 YV13...
Page 49: ...UK Operator smanual 103 21...
Page 50: ...104 Operator smanual 21_1...
Page 51: ...UK Operator smanual 105 21_2...
Page 54: ...108 Operator smanual Notes...