ENGLISH
April 2013
34
11-SET-UP AND ADJUSTMENTS
11.0 SECURITY
ll the operations to prepare and adjust the machine must be made with
the E-stop locked.
11.1. TAPE LOADING ON THE TOP UNIT
Insert a tape roll on the drum and push it fully forward.
Attach the tape leg to the threading tool (supplied with the tools kit).
Insert the plastic threading leader through the taping unit. Take care to
keep hands away from the tape cutting blades. (see section 3.11-b)
Follow the path through the unit as shown on picture and make sure
that the adhesive side is placed on the correct side.
Pull and cut off the excess tape using a pair of scissors as shown.
Summary of Contents for SM446-650-HD
Page 33: ...ENGLISH April 2013 33 ...
Page 56: ......
Page 65: ...19 52 SM446 650 HD Maggio 2013 Fig 15750 53 ...
Page 67: ...19 52 SM446 650 HD Maggio 2013 Fig 15750 53 ...
Page 69: ...SM446 650 HD Maggio 2013 Fig 15751 20 21 22 23 ...
Page 75: ...1 2 3 4 5 4 5 6 7 SM446 650 HD Maggio 2013 Fig 15754 ...
Page 85: ...1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 SM446 650 HD Maggio 2013 Fig 15758 ...
Page 87: ...8 9 13 14 16 17 18 15 11 10 5 6 4 29 28 30 31 SM446 650 HD Maggio 2013 Fig 15759 4 6 1 ...
Page 88: ......
Page 89: ...AS26 650 HD Maggio 2013 SBC0023251 Fig 15647 Fig 15648 Fig 15738 Fig 15739 Fig 15740 ...
Page 97: ...1 2 3 4 5 6 7 8 9 10 11 AS26 650 HD Maggio 2013 Fig 15647 ...