background image

 

 File 

Doc. No. 

             Date 

 Version 

Page 

DBHB-20 

5700 9004 055 

Aug 05 

 1.0 

4/12 

 

 

 

Next Generation 
Signal Enhancement 

 

1.0  About the manual   

 
The “Installation and Operation manual” is intended to be used for SHYAM 
DBHB-20 booster installation.  It contains the general guidelines for the person 
installing the DBHB-20 booster. Read carefully before starting the DBHB-20 
booster installation. 
 

2.0  Important Safety Information 

 
The DBHB-20 booster has been designed for maximum safety when installed 
and operated according to the instructions in this manual. Refer to all safety 
instructions as per the antenna installation instruction sheets.  
 
Do not bypass any of the safety features with the equipment provided, nor 
operate the system in an inappropriate environment. 
 
 

WARNING!

 Installation of antennas near power lines is dangerous. For your 

safety, follow all installation directions and keep safe distance from any 

high voltage power lines that could result in shock or loss of life. 

 

WARNING!

 This equipment complies with FCC & IC radiation exposure 

limits set forth for an uncontrolled environment. This transmitter must not 
be co-located or operating in conjunction with any other antenna or 
transmitter. The signal booster with server antenna must be installed to 
provide minimum 20 cm separation distance between the server antenna to 
the body of user or near by person. The donor antenna used for this 
transmitter must be fixed-mounted on outdoor permanent structures with a 
separation distance of at least 1.5 meters from all persons during normal 
operation. 

 
Additional wiring required to install the DBHB-20 system should comply with 
national or local governing Electrical Codes. Indoor RF coaxial cable installations 
should comply with local Electrical Code requirements.  
The DBHB-20 booster is designed for indoor application. The housing is not 
waterproof, so please keep it away from water, rain and any chemical liquid. 
Do discharge the static before you touch the connectors of the booster. 

Do not open the module inside the booster unless you are authorized. 

The power supply unit in the DBHB-20 booster is supplied from the mains 
(primary AC power) that contains dangerous voltage level which will cause 
electric shock, Please turn off the mains before you install / uninstall the booster. 
The primary AC power should be in the range of AC90-240V, 50/60Hz. Booster 
will be damaged if the primary AC power is out of the range. 
 

Summary of Contents for DBHB-20

Page 1: ...information contained herein is proprietary to Shyam Telecom Limited Use or disclosure of this document or the information contained herein for any purpose other than that for which it was furnished...

Page 2: ...Booster Theory Background 5 4 0 Description of DBDBHB 20 Booster installation Kit 6 5 0 System Design and Setup 7 6 0 Installing the DBHB 20 7 6 1 Pre installation considerations 7 6 2 Installation T...

Page 3: ...at the following address SHYAM Telecom Ltd A 60 Naraina Industrial Area Phase I New Delhi 110028 INDIA Tel 91 11 51411076 Fax 91 11 51411078 Email repeater shyamtelecom com Under consideration of all...

Page 4: ...e co located or operating in conjunction with any other antenna or transmitter The signal booster with server antenna must be installed to provide minimum 20 cm separation distance between the server...

Page 5: ...indoor areas such as office buildings parking garages apartment buildings shopping malls and residential homes Outdoor areas are degraded by geographic topologies such as mountains valleys dense foli...

Page 6: ...The indoor antenna of DBHB 20 booster provides RF signal in all directions downward and outward from the installation point A adopter is supplied with DBHB 20 powered by universal 90 240 VAC mains sup...

Page 7: ...the received signal level from the base station It is imperative to monitor the received signal level from the base station also called downlink signal Downlink signal may change if some high building...

Page 8: ...e donor antenna and DBHB 20 booster which is supplied in the installation kit 7 Ensure that the three pin power point has proper earthing connection before switching on the power to booster Please rem...

Page 9: ...the SIM card of cellular operator measure and monitor the signal level at various points within and around the perimeter of the coverage area 6 5 Display Details of DBHB 20 UL ALIGN LED will glow aft...

Page 10: ...r different operators world wide Contact SHYAM with coverage area Operator name Nominal Gain 65 dB Min 75dB Max in each band Automatic Gain adjustment 31 dB steps of 1 dB Auto Power Control range 10 d...

Page 11: ...beginning but after few days the performance has degraded 1 The received signal level from the base station might have degraded due to environmental changes such as new building construction and so o...

Page 12: ...l controls accessible to the user for any adjustments to operate in violation of the limits prescribed in this Standard Furthermore information on internal adjustments reconfiguration or programmabili...

Page 13: ...DBHB 20 5700 9004 055 Aug 05 1 0 13 12 Next Generation Signal Enhancement For Customer Use Only SHYAM Telecom Ltd 246 Phase IV Udyog Vihar Gurgaon 122015 INDIA Tel 91 124 5108830 Fax 91 124 5018117 Em...

Reviews: