10
Ordercode: 40200
Phantom 50 MKII
Backside
Fig. 03
04)
3-pin DMX signal connector IN
05)
3-pin DMX signal connector OUT
06)
Fuse F2AL/250V
07)
IEC power connector 100-240V OUT
08)
IEC power connector 100-240V IN
09)
Ground/earth connection
10)
Built-in microphone
Installation
Remove all packing materials from the Phantom 50 MKII. Check if all foam and plastic padding is
removed. Connect all cables.
Do not supply power before the whole system is set up and connected properly.
Always disconnect from electric mains power supply before cleaning or servicing.
Damages caused by non-observance are not subject to warranty.
Set Up and Operation
Follow the directions below, as they pertain to your preferred operation mode.
Before plugging the unit in, always make sure that the power supply matches the product specification
voltage. Do not attempt to operate a 120V specification product on 230V power, or vice versa.
Connect the device to the main power supply. The device can be sound-controlled as it is equipped
with a built-in microphone.