7
Set Up and Operation
Follow the directions below, as they pertain to your preferred operation mode.
Before plugging the unit in, always make sure that the power supply matches the product specification
voltage. Do not attempt to operate a 120V specification product on 230V power, or vice versa.
Always disconnect from electric mains power supply before cleaning or servicing.
Damages caused by non-observance are not subject to warranty.
12V/24V Option
1.
The Par 16 has only has 2 cables, meaning it is intended for low voltage 12/24V.
2.
The GX 5.3 socket is
ONLY
intended for MR16 lamps (20W, 35W and 50W) and a maximum of 12V/24V.
3.
When you’re using 12V/24V, you have to use a 12V or 24V transformer to connect this parcan.
230V Option
1.
If you want to use a 230V bulb, you have to attach a different cable with an earth connection.
2.
The right specifications for the Par 16 when using 230V are:
GU 5.3 socket
MR16 lamps
Max. capacity: 50W
We don’t sell any 230V bulbs for the Par 16. However there are other companies that do offer these
specific lamps online.
When running a Par 16 on 230V without an earth connection, is very dangerous !!!
Please make sure there is an earth connection.
The housing or the rail, to which the PAR16 is connected, has to be earthed
Maintenance
The Showtec Par 16 requires almost no maintenance. However, you should keep the unit clean.
Otherwise, the fixture’s light-output will be significantly reduced.
Disconnect the mains power supply, and
then wipe the cover with a damp cloth. Do not immerse in liquid. Wipe lens clean with glass cleaner and
a soft cloth. Do not use alcohol or solvents. Keep connections clean. Disconnect electric power, and
then wipe the connections with a damp cloth. Make sure connections are thoroughly dry before linking
equipment or supplying electric power.
The operator has to make sure that safety-relating and machine-technical installations are to be
inspected by an expert after every four years in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are to be
inspected by a skilled person once a year.
The following points have to be considered during the inspection:
1.
All screws used for installing the device or parts of the device have to be tightly connected and must
not be corroded.
2.
There may not be any deformations on housings, fixations and installation spots.
3.
Mechanically moving parts like axles, eyes and others may not show any traces of wearing.
4.
The electric power supply cables must not show any damages or material fatigue.
Changing the Lamp
1.
Disconnect mains power supply. Allow the fixture to cool for at least 15 minutes before handling and
replacing lamp.
2.
Pull the pin on top of the Par 16 upwards.
3.
Gently remove the small housing on the backside.
4.
Read lamp instructions.
5.
Follow directions for installing a new lamp, page 6.
Summary of Contents for Parcan 16
Page 11: ......