![ShockWatch CS7520EDR Operations And Maintenance, Instructions Of Shipment, Unpacking And Installation Download Page 6](http://html.mh-extra.com/html/shockwatch/cs7520edr/cs7520edr_operations-and-maintenance-instructions-of-shipment-unpacking-and-installation_1258866006.webp)
Installation Procedure
Step 1. Insert 3 M6 cage nuts each from the inside of BEAM-1 and BEAM-2 on the spine side in order to support the shelf as shown in the figure below.
Cage Nut Placement for Shelf on BEAM-1 and BEAM-2
Step 2. Insert 6 M6 cage nuts from the inside each of BEAM-3 and BEAM-4 on the leaf side in order to support the shelf as shown in the figure below.
Cage Nut Placement for Shelf on BEAM-3 and BEAM-4
Some of the steps that follow are accompanied by figures that illustrate the installation of the switch system chassis. For the purpose of clarity,
.
the racks in those figures will have the side panels removed. You, however, do not need to remove the side panels to install the switch chassis
It is recommended to have at least three people for the duration of the installation procedure. Use a mechanical lift to raise this chassis. If not,
use enough manpower to ensure the safety and wellbeing of all of the people involved in the installation.
It is recommended to set the shelf at U3 since the chassis would roll off more easily on it from the pallet.