![ShockWatch CS7520EDR Operations And Maintenance, Instructions Of Shipment, Unpacking And Installation Download Page 15](http://html.mh-extra.com/html/shockwatch/cs7520edr/cs7520edr_operations-and-maintenance-instructions-of-shipment-unpacking-and-installation_1258866015.webp)
Step 14. Put the crate on the fork lift or a mechanical lift.
Mechanical Lift
Fork Lift
Step 15. Position the chassis in front of the installation rack.
Step 16. Unscrew both lock-down bars.
Step 17. Using a fork or mechanical lift, position the middle of the leaf-side of the chassis in front of the spine-side of the rack.
Rack and Chassis Alignment
From Steps 14-21, three people should participate in the installation process.
The chassis is on ball bearings and can roll easily. Beware that the chassis can roll off of the pallet possibly causing grave bodily harm should it
fall on someone.