Check that all joints are level and solid, without cracks, in the tapered sweep 

wheel track, and that the track is pop riveted, not screwed, down.  

Make certain the tapered sweep wheel(s) do not hit pop rivets in the track.

Make sure the tapered sweep augers have "flex" in the coupling by lifting the 

outer end in several locations around the bin.

Make sure gearbox is square with the floor.  Use gearbox laser kit.

Check that the chain coupler master link is installed correctly.

Make sure there is 1/8 - 1/4" gap between the horizontal flight weldment tube 

and the sprocket on 1" drive shaft where O-ring is located, inside the basket.

Make sure the Center Vertical is plumb.

Make sure the spreader wheel has fins installed as needed and extra fins are 

given to the operator.

Make sure center vertical chain turnbuckles are wired to prevent loosening.

Check pickup fingers for proper clearance and engagement.  Make sure the 
cone is all the way into the spider wheel.

Make sure the 3-jaw clutch and unloading pin will operate correctly.

Check belt alignment and tension.  Make sure belts don't try to roll over.

Check slide gates for proper operation and leave them in the closed position.

Make sure all Safety Decals are in place as shown in P-10001 Operator's 

Safety  Manual.  Make sure all guards are in place.

Make sure the Safety Lock Kits (632-101A) are installed as shown in this 
manual and P-10001 Operator's Safety Manual, and P-11175 Instructions.  
Either the bin entrances or the power should be locked off.

Make sure the operator has the Operator's Safety Manual, Operating manuals 

for each piece of equipment installed, and Safety Lock keys.  Make sure they 

understand how to operate each piece of equipment safely.

1

 

 

2

3

4

  

5

6

7

8

9

10

11

12

 

13

14

15

16

Summary of Contents for Circu-Lators I

Page 1: ......

Page 2: ......

Page 3: ......

Page 4: ......

Page 5: ......

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ......

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Page 36: ......

Page 37: ......

Page 38: ...ng surfaces are clean not oily and dry P 10811 Field Installed 1 ON MAIN POWER DISCONNECT SWITCH BOX Put it only on the disconnect that shuts power off to the complete drying system every motor fan and burner Don t put it on any other disconnect ...

Page 39: ...P 11035 Field Installed 1 OUTSIDE OF OUTER BIN DOOR ENTRANCE 2 OUTSIDE OF INNER BIN DOOR ENTRANCE 3 NEAR MANHOLE ENTRANCE ...

Page 40: ...P 10125 Field Installed 1 INSIDE OF OUTER BIN DOOR ENTRANCE ON ALL BINS 2 NEAR MANHOLE ENTRANCE ON ALL BINS ...

Page 41: ...ce Leave the power locked off If the dryer bin is not equipped with a lockable entry door in good condition attach one end of the cable assembly to the bin side wall Use an existing bolt or use the hardware provided Attach the staple plate to the bin entrance door within reach of the opposite end of the cable assembly Use the hardware provided or weld the staple plate securely to the door Install ...

Page 42: ...y the decal to the padlock These locks can then be used to lock out power sources when working on the drying equipment Keep the bin entrances locked when operating the equipment to prevent unauthorized access to potential dangers The locks will also remind you to disconnect and lock out power sources before entering the bin ...

Page 43: ...o the operator Make sure center vertical chain turnbuckles are wired to prevent loosening Check pickup fingers for proper clearance and engagement Make sure the cone is all the way into the spider wheel Make sure the 3 jaw clutch and unloading pin will operate correctly Check belt alignment and tension Make sure belts don t try to roll over Check slide gates for proper operation and leave them in ...

Reviews: