4
4
.
.
R
R
E
E
F
F
R
R
I
I
G
G
E
E
R
R
A
A
N
N
T
T
F
F
L
L
O
O
W
W
D
D
I
I
A
A
G
G
R
R
A
A
M
M
20
4.2 Evacuation procedures
:
EVACUATION PROCEDURES
Connect the refrigerant pipes (both the liquid and
gas pipes) between the indoor and the outdoor units.
Remove service port cap of the stop valve A and connect gage manifold valve and vacuum
pump to it.
Run the vacuum pump for more than 15 minutes and at this time confirm that the pressure
gage indicates -0.1Mpa(-76 cmHg).
Stop pump and keep the pressure for one or two minutes. Make sure the pressure is no
change(if the pressure is changed to high, there is some leakage for the pipe connection).
Remove gage manifold valve quickly from the service port of the stop valve A.
full open the stop valves A on gas and liquid pipe sides.
Total pipe length is in the range:
No gas charge is needed
Total pipe length exceeding the limit:
Charge the prescribed amount of gas.
Tighten the cap to the service port to obtain the initial status.
Retighten the cap.
Leak test
Repeat the steps above for other valves(B\C\D), be sure all refrigerant pipes are
connected and evacuated, and all valves are full opend.
Summary of Contents for SRH-PM18DC
Page 20: ...5 5 E EL LE EC CT TR RI IC CA AL L D DA AT TA A 23 2 AMS 18UR4SVUP3 VG3 VL3 VT3 UP3 UL3 UQ3 ...
Page 21: ...5 5 E EL LE EC CT TR RI IC CA AL L D DA AT TA A 26 OUTDOOR 1 AMW2 16U4SGC1 ...
Page 22: ...5 5 E EL LE EC CT TR RI IC CA AL L D DA AT TA A 29 4 AMW3 24U4SZD ...
Page 23: ...5 5 E EL LE EC CT TR RI IC CA AL L D DA AT TA A 32 7 AMW4 36U4SAC ...
Page 64: ...9 9 P PA AR RT TS S L LI IS ST T 67 MODEL AMS 18UR4SVUP3 UL3 UQ3 VG3 VL3 VT3 ...
Page 67: ...9 9 P PA AR RT TS S L LI IS ST T 89 Mode AMW4 36U4SAC ...