We recommend the wearing of non-

slip  protective gloves throughout 
the assembly process. We also 
recommend the wearing of steel 
capped  protective shoes,         
protective head gear, safety glasses 
and full length clothing. If step 
ladders are to be used we recom-
mend one person holds the ladder 
whilst the other is using them. If 
necessary a third person should be 
used. Do not attempt to erect the 
building in windy conditions. Follow 
any safety precautions quoted by 
the manufacturer for any equipment 
you use.  
  

• 

Every precaution has been taken to 

ensure that your building has no 
element incorrectly placed or   
possibly hazardous. However prior 
to use please check for raised grain 
or splinters and sand if necessary. 
Check that all elements are secure 
against reasonable force. 

 

1.  Place one hinge on the inner rebate 
part of the window; approx. 50mm along 
from the rebate edge. The rounded part 
of the hinge should sit above the outer 
edge of the window. Screw the inner 
piece into position ( fig. 1 )using the pre 
drilled holes in the hinge

 

and 2x 25mm 

screws. Repeat. 

 

Fig 1 

2.  Place the window into the aperture. 
Secure the window to the panel using   
3x 25mm screws per hinge, (fig. 2 )  
again through the predrilled holes I n the 
hinge. Repeat. 

 

Fig 2 

3 From the outside, open the window 
fully in order to fit a further 2x 25mm 
screws per hinge ( Fig.3 ). 

 

Fig3 

Fitting the Casement Stay. 

Place 

the casement stay centrally on the 
inside of the window (Fig 4 ). Place the 2 
pins under the casement stay. 
Position so that it is not resting on the 
window frame and not so high that the 
pins are of no use. 

 

Fig 4 

5 Fit the Casement Stay (fig 5 ) on the 
window using 2x 25mm screws. 

 

Fig 5 

6 Mark where the ‘pins’ will be placed. 

 

Fig 6 

7 Secure into position using 4x 25mm 
screws - 2 in each pin 

.1. Place the continuous hinge along the 
length of the door (fig 7 ) making sure 
that the hinge does not protrude at either 
top or bottom. 

2 .Fit the small inner part of the hinge to 
the door using 6 x25 mm screws in total 

 

 

fig 7 

 

Fitting the door 

to frame. 

Place 

the door into the 
aperture. Ensure 
there is an equal 
gap between the 
edges of the door 
and the aperture. 
Screw into position 
using 3 x 25mm 
screws per hinge. 
(fig 8 & 9) 
 

 
 

Fig 8      

 

Fig 9 

 

 

See drawing pages1& 2 . 

   

 

Fig 10 

 1. Take one of the A1 logs and mark the   
895mm from one end (fig 10 ) . This is 
the centre line of the middle bearer, 
2. Mark  388mm either way of this line.           
(This is the centre of the next two 
 bearers).  

    

 

Fig 11 

3. Place the other ’A1’ log against the 
first one and transfer the lines across 
 (fig 11).   
4.  Layout pressure treated base floor 
bearer timbers (See page 1 of the 
drawing sheets.) 
5. The bearers stand with the narrowest 
edge to the floor (fig 12 ) and their ends 
flush with the outside of the A1 logs. 

 

Fig 12 

6. Position the bearers that sit under the 
full logs at the sides and measure 20mm 
from the log to the edge of the bearer 
( fig 13 ), all the way down . This is for 
the floorboards to sit on. 

 

Fig 13 

8. cut notches out of the tongues on the 
A1 logs ( fig 14)at centre marks (steps 1 
to 3 above )  and drill  through for fixing 
bearers  
9.  

Important 

Measure corner to corner, as building 
must be square  
10 Also measure length at the centre of 
the building from wall to wall (A1 toA1) to 
ensure correct length 
before fixing to joists with 1x 80mm 
screw (fig14) at each bearer at each end. 

 

Fig 14 

 
 
 
 

 

See drawing pages 2,3,4,5,6,7 

1 Using parts list for each wall layout 
correct quantity (fig 15 ) of each      
component 
for relevant wall (i.e. front, back) in 
suitable position for ease of assembly. 

 

Fig 15 

2.  This is the bottom of all four walls 
now ready to be built upon. 
3.  The walls can now be assembled 
as per pages 2,3,4,5 and 6.start 
building walls either anti-clockwise 
or clock-wise direction. 
4. 

The logs are assembled with the 

tongues upwards 

9 Each log needs to be tapped home 
to log below using timber block 
supplied and a rubber mallet (fig 16). 

 

Fig 16

 

1 Door unit must be placed into 
position after the first two layers of 
full logs have been assembled 
2 Slide unit into aperture from above 
(Fig 17& 18) ensuring unit is 
completely down and in position. 

 

Fig 18

 

IMPORTANT SAFETY INFORMATION 

A Hinges-windows 

B Fit door 

C Base frame 

D Walls 

Inserting windows and doors

 

Assembly of playhouse –please read instructions prior to assembly 

Reviews: