
500mm
500mm
During installation of the machine, keep at least 500mm installation space
around the machine as shown by the picture. Do not install the machine in
a position crowded with other objects. This would cause inconvenience to
operation, maintenance and repair.
Do not sit on the machine.
Keep away flammable and explosive goods.
Installation and Debugging
3. Installation and Debugging
3.1 Installation Space
3.2 Mould and Water Couplings
1) When connect mould coupling with pipes
from the mould. Use a spanner to secure
one end of the coupling, insert mould
connecting pipe and fasten it by another
spanner.
Summary of Contents for STM-W
Page 1: ...Water Heaters STM W Operation Instruction Model STM 910W ...
Page 2: ......
Page 18: ...2 3 STM 304W Series Assembly Drawing Structure characteristics and working principle ...
Page 20: ...2 5 STM 607W 607WR 607W DAssembly Drawing Structure characteristics and working principle ...
Page 23: ...2 7 STM 910W 910WR 910W D Assembly Drawing Structure characteristics and working principle ...
Page 67: ...Electrical Components Layout Structure characteristics and working principle ...
Page 93: ...Electrical Components Layout Structure characteristics and working principle ...