4(65)
2.4
Main Electrical Components Description............................................ 35
2.4.1
Overload Relay ........................................................................ 35
2.5
Operation Procedures ........................................................................ 36
2.5.1
Installation steps for options water manifold (dewaxing).......... 36
2.5.2
Installation steps for options water manifold (welding)............. 36
3.
Installation and Debugging..................................................................... 38
3.1
Installation Space............................................................................... 38
3.2
Mould and Water Coupling................................................................. 38
3.3
Power Supply ..................................................................................... 39
4.
Operation Guide ...................................................................................... 40
4.1
Control Panel ..................................................................................... 40
4.2
Menu Introduction .............................................................................. 43
4.3
Machine Startup ................................................................................. 43
4.4
Parameter Reference Table ............................................................... 52
4.5
Stop the Machine ............................................................................... 53
5.
Trouble-shooting ..................................................................................... 55
6.
Maintenance and Repair ......................................................................... 57
6.1
Open the Covers ................................................................................ 57
6.2
Y Type Strainer .................................................................................. 58
6.3
Solenoid Valve ................................................................................... 59
6.4
Pipe Heater ........................................................................................ 59
6.5
Printed Circuit Board .......................................................................... 60
6.6
Displayer Terminal Connecting Diagram............................................ 63
6.7
Maintenance Schedule....................................................................... 64
6.7.1
About the Machine................................................................... 64
6.7.2
Installation & Inspection........................................................... 64
6.7.3
Daily Checking......................................................................... 64
6.7.4
Weekly Checking ..................................................................... 64
6.7.5
Trimonthly Checking ................................................................ 64
6.7.6
Half-yearly Checking................................................................ 64
6.7.7
Yearly Checking....................................................................... 65
6.7.8
3 year Checking....................................................................... 65
Summary of Contents for STM-1220-PW
Page 1: ...STM PW Series Hi Temp Water Heater Date Dec 2014 Version Ver B English ...
Page 2: ......
Page 25: ...25 65 2 3 2 Control Circuit STM PW 400V Picture 2 6 Control Circuit STM PW 400V ...
Page 29: ...29 65 2 3 5 Main Circuit STM PW 230V Picture 2 8 Main Circuit STM PW 230V ...
Page 30: ...30 65 2 3 6 Control Circuit STM PW 230V Picture 2 9 Control Circuit STM PW 230V ...
Page 62: ...62 65 ...