![Shini SAL-700G Series Manual Download Page 24](http://html.mh-extra.com/html/shini/sal-700g-series/sal-700g-series_manual_1258036024.webp)
24(34)
Optional proportional valve SPV-U can realize two kinds of materials mixing.
Installation:
1) Mount the SPV-U at material inlet of SMH(SVH) lock up and fix the screws.
2) Put the SMH on SCH-6L or put the SVH at the material inlet of molding
machine. Point to the holes and lock up the screws, then connect the signal
wire to the hopper loader of SAL-G.
3) Connect the air inlet of vacuum hopper with steel wire hose separately to
corresponding air inlet of SAL-G. Connect the material inlet of storage silo to
the material inlet of vacuum hopper.
3.5 Installation of SAL-G Optional Cyclone Dust Seperator
Picture 3-8: Optional ACF-1 Installation Layout
When conveying plastics contain dusts in high proportion, optional dust cyclone
separator is recommended to reduce the purging times of main machine filter.
Installation:
1) Mount the ACF-1 on coverplate of SAL-G and lock up the screws(There
’
s two
holes on coverplate of SAL-G main machine for installation);
2) Connect the air inlet of SAL-G main machine with steel wire hose to air outlet
of ACF-1.
3) Connect the air inlet of ACF-1 with steel wire hose to air inlet of the hopper;
4) Connect one end of steel wire hose to hopper material inlet, and connect to
the suction inlet of storage tank.