![Shini SAL-700G Series Manual Download Page 21](http://html.mh-extra.com/html/shini/sal-700g-series/sal-700g-series_manual_1258036021.webp)
21(34)
connect the material inlets of sensor hopper to the hopper dryer.
*Optional shut-off valve. It makes no material to remain in the suction material
hose, and avoid remaining material be moisture regain. Its working principle:
The shut-off valve is linked-do with the sensor hopper, when the hopper is
working, the shut-off valve can be open, and it lasts for some time (adjusted
time), then it can be closed. In this period, the auto-load goes on working for
suction, and the materials remain in the material hose A will be sucked into
sensor hopper completely.
Air suction
inlet
IMM
SVM
Air suction pipe
Hopper
drying
IMM
SVM
SAL-900GE
Air suction
pipe
Picture 3-4: Installation Layout 2
Installation:
1) Place the SAL-900G/900G2 achine at a proper position on the ground,
connect the three phase power cord and the earth.
2) Install the photosensor hopper receiver (SVH) on plastic injection machine.
Connect the signal cord to the machine SAL-900G/900G2 .
3) Use the steel wire hose to connect the air suction inlets of photosensor
hopper receiver (SVH) to the air inlet of SAL-900G/900G2. Then connect the
material suction inlets of hopper dryer to material suction inlets of
photosensor hopper receiver (SVH).