
22
GUIDE BAR
•
Clean before using.
−
Clean the groove of the guide bar with for
example a small screw driver.
−
Clean oil holes with a wire.
•
Reverse guide bar periodically.
•
Clean sprocket, clutch and bar mount area before
installation of guide bar.
AUTOMATIC OILER
•
The discharge volume of the automatic oiler is
adjusted to 7 mL/min approximately at 7,000 r/min,
prior to shipment from factory.
−
To increase the deliverly volume, turn the
adjusting screw counterclockwise. When the
adjusting screw touches stopper and stops, this
position indicates maximum discharge volume. (13
mL/min 7,000 r/min)
−
Do not turn the adjusting screw beyond the max.
or min. limit of volume adjustment.
MAGNETO
•
The unit has CDI (Capacitor Discharge Ignition)
system, which does not require adjustment of
ignition timing.
•
Check for secure (tight) wire connections.
SPROCKET
•
The damaged sprocket will cause premature
damage or wear of saw chain.
−
When the sprocket has worn out 0.5 mm or more,
eplace it.
•
Check sprocket when you install new chain. Replace
it if worn.
SPARK PLUG
•
Check periodically.
−
The standard spark gap is 0.6 to 0.7 mm.
−
Correct the spark gap if it is wider or narrower
than the standard gap.
•
Fastening torque: 15 to 17 N
・
m (150 to 170 kgf
・
cm)
CYLINDER FINS
Check periodically.
•
Clogged fins will result in poor engine cooling.
•
Remove dirt and dust from between fins to let
cooling air pass easily.
NOTE
When replacing guide bar or saw chain, ask your
shindaiwa dealer.
0.6
‐
0.7 mm
screw
Oil adjusting
0.5 mm
Oil hole
Groove
Saw chain
0.5 mm
INCREASE
DECREASE
Summary of Contents for 269T
Page 10: ...10 DESCRIPTION 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20...
Page 26: ...26...
Page 27: ...27...