11
4. Handling of pump (Before starting operation)
1. Unpacking
(1) Make sure the model indicated on the front of case is an ordered one.
(2) Cut the bands which bundle the case.
(3) By pulling up the case, the main unit and accessories appear.
(4) Check the contents.
A. Main machine unit (One as ordered? Not damaged? ) 1
B. Battery 1
C. Charger 1
D. Tool bag 1
E. Pump cover 1
A thin PVC cover is put on the machine. Be sure to remove it before running.
2. Mounting the battery
(1) While pulling up the under cover of the main unit, pull it off this side.
(2) Using 2 rods and 1 holder contained in the package, mount the battery on
the bed.
(3) Connect the (+) battery cord (red PVC tape wound on) and then (-) cord
(black PVC tape wound on) in this order on the battery using the attached
hexagon bolts and nuts.
○
When disconnecting the battery cords, disconnect the (-) cord first and
connecting, connect the (+) cord first.
If not, short circuit may result leading to a fire or you may get burnt.
(4) Mount the under cover.
(5) Carry out charging for 2-3 hours.
3. Replenishing the fuel
(1) Supply the fuel into the tank(tank capacity
14.5L)
The engine of this firefighting pump is fueled
independently of the lubricating tank. Supply
automobile regular gasoline up to the “F”
mark of the fuel gauge. Do not use mixed gasoline and Bio-gasoline.
Caution
Summary of Contents for FT450-A
Page 2: ......
Page 40: ...37 8 Wiring diagram...
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ...200812300 0 2016 6 URL www ihi shibaura com english Printed in Japan...