
26/54
Disassembling the left side
For additional details refer to the parts catalog 250i and 300i.
Disassembling the ignition case:
•
Drain the engine oil.
•
Remove the 10 screws that retain the
ignition case.
•
Visually inspect the inner surfaces of the
rotor [A] and the outer surfaces of the stator [B].
•
Check the pulse generator (sensor)
•
Replace if necessary.
Replacing the stator and sensor system:
•
Remove the two screws that retain the
sensor [C] and the two screws that retain the
stator [D].
•
Install the new parts.
•
Reinstall the screws using the proper
torque.
Torque the stator and sensor screws to:
8Nm.
Removing the rotor:
•
Utilize the special rotor holding tool
number 1815.
•
Remove the rotor fixing nut.
B
A
D
C
Summary of Contents for 2012 SE 250i-R
Page 1: ...Shop manual 2012 SE 250i R SE 300i R...
Page 50: ...49 54 Cable diagram...
Page 52: ...51 54 Cable diagram...
Page 53: ...52 54 Racing lighting cable diagram...
Page 54: ...53 54 Flasher installation cable diagram...
Page 55: ...54 54 Fan cable diagram...