
Ver 1.11 2018
37
6.
Electrical Connection
The electrical connection is to be made via a socket outlet with grounding contact
providing 220-240 V and 50-60 Hz.
The electrical socket outlet must be located close to the furnace and be easily
accessible.
NOTE: When using an extension cord or a multiple socket outlet, do not exceed the
respective max. electrical load rating.
▷
Connect the supplied mains cable to the socket intended for this purpose at the rear
of the furnace . Use the original Cable supply by Shenpaz , Max length 1.5 M
WARNING:
The mains cable may not be damaged!
▷
Do not place objects on the mains cable.
▷
Lay the mains cable in such a manner that nobody can step on or trip over it.
7.
Start a Sintering program
Place your restoration into the tray and into the furnace.
Manually close the furnace door.
Action one of the 3 options of programming, edit the program or checks the
program.
On the Graph screen press
▷
to start the program
From this point, you will be able to follow the cycle on the graph screen and see the
remaining time of the cycle.
NOTE:
Insufficient sintering results due to faulty temperature control!
▷
Check the thermocouple for damage.